My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-13_PERMIT FILE - C1992081A (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081A
>
2008-03-13_PERMIT FILE - C1992081A (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:24:58 PM
Creation date
6/4/2008 5:29:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
3/13/2008
Doc Name
Railcar Loadout Operations Plan Reclamation Liability Estimate
Section_Exhibit Name
Tab 23 Attachment 23-2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />L' <br />Hayden Guich Loadout <br />Coal Loadout Operations Plan Reclamation Liability Summary Table <br /> <br />Prepared 1117/07 <br />Tasks, Task Descriptions and Costs are based on TR-06 CDMG Liability Calcu <br />lation prepare <br />d 6110/05 <br />!i <br />DIRECT COSTS <br />Task Task Description Task Hours Direct Cost <br />OOa Backfilling and Rough Grading Tasks -Task 001 - 003 495.06 $87,300 <br />OOb Ripping Tasks -Tasks 006 - 008 26.77 $4,961 <br />OOc Road Reclamation Tasks -Tasks 011 and 012 26.89 $4,742 <br />OOd Finish Grading Tasks -Task 015 81.11 $8,863 <br />OOe Drainage Control System Removal Tasks -Task 018 - 021 49.38 $8,708 <br />OOf Topsoil Replacement Tasks -Tasks 024 and 025 262.3 $99,853 <br />OOg <br />OOh Borehole Sealing Task -Task 0282 <br />Revegetation Tasks -Task 031 - 034 8.00 <br />209.00 $733 <br />$80,695 <br />OOi Building Demolition Task -Task 0373 $436,956 <br />OOj Miscellaneous Reclamation Tasks -Tasks 040 and 041 131.11 $11,492 <br />OOk Equipment Mobilization/Demobilization Tasks -Tasks 045 - 047 11.80 $7,330 <br /> Direct Costs Subtotal $751,633 <br /> <br />INDIRECT COSTS <br /> Overhead and Profit <br /> Liability Insurance (1.55% of Direct Costs) $11,650 <br /> Performance Bond (1.05% of Direct Costs) $7,892 <br /> Job Superintendent (at $36.25/hour) 775.71 $28,119 <br /> Profit (10.0% of Direct Costs) $75,163 <br /> Overhead and Profit Subtotal $122,825 <br /> <br /> Contract Amount (Direct Costs + Overhead and Profit) $874,458 <br /> <br />LEGAL, ENGINEERING, PROJECT MANAGEMENT <br /> Engineering Work and Contract Bid Preparation (4.25% of Contract) $37,164 <br /> Reclamation Management and Administration (6.00% of Contract) $52,467 <br /> <br />TOTAL RECLAMATION LIABILITY AMOUNT $964,090 <br /> <br />Notes: 1) Tasks, Task Descriptions and Cost worksheets prepared by CDMG are found in Attachment 23-1 <br /> 2) Well abandonment for wells HGDAL-3 and HGDAL-4 only; wells HGDAL-1 and HGDAL-2 were abandoned in <br />August 2007 (see Tab 7) <br /> 3) Demolition Costs calculated using existing and on-the-ground buidiings (per Table 12-1.2) and CDMG <br />demolition costs from the TR-06 Task 037 worksheet -see Facility Demolition worksheet on page2 23-2.4 and <br />23-2.5 <br />MR-16 <br />23-2.3 <br />Revised 11/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.