My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-13_PERMIT FILE - C1992081A (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081A
>
2008-03-13_PERMIT FILE - C1992081A (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:24:58 PM
Creation date
6/4/2008 5:29:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
3/13/2008
Doc Name
Railcar Loadout Operations Plan Reclamation Liability Estimate
Section_Exhibit Name
Tab 23 Attachment 23-2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />• <br />lch Loadout <br />G <br />d <br />H <br />u <br />en <br />ay <br />Facility Demolition -Existing and On-the-Ground Building s <br />(Coal Loadout Operations) <br />d 11/7107 <br />P <br />repare <br />Buildings and Dimensions presented in Table 12-1.2 <br />Unit Costs are based on CDMG Liability Calculation prepared 6/10/05 as part of TR-06 <br /> <br />Description Dimensions Reference Quantity Unit Cost Total Cost <br />Disconnect electrical power supply 5 Electrician3 5 HR $65.00 $325.00 <br /> <br />Section 14 Fence Removal (from Land Board lands) 3800 Dillon Fencing4 3800 LF $0.40 $1,520.00 <br />Disconnect electrical power supply to interior light poles 4 Electrician3 4 HR $65.00 $260.00 <br /> 2 CDMGS 2 HR $99.75 $199.50 <br />Remove interior light poles 8 HR 00 <br />$30 $240.00 <br />Remove mine ID signs 8 . <br /> <br /> $360,268.71 <br />Building Demolition and Removal Subtotal <br /> 166 CDMG, CIRCES' 166 LF $3.435 $570.21 <br />12" culverts 469 CDMG, CIRCES' 469 LF $4.335 $2,033.12 <br />18" culverts <br />24" culvert 940 CDMG, CIRCES' 940 LF $5.945 $5,588.30 <br />36" culverts 50 CDMG, CIRCES' 50 LF $9.64 $482.00 <br />42" culverts 152 CDMG, CIRCES' 152 LF $12.885 $1,958.52 <br />60" culverts 290 CDMG, CIRCES' 290 LF $20.12 $5,834.80 <br />96" culverts 165 CDMG, CIRCES' 165 LF $43.275 $7,140.38 <br />102" culverts 585 CDMG, CIRCES' 585 LF $54.105 $31,651.43 <br /> 330 CDMG, CIRCES' 330 LF $64.935 $21,428.55 <br />108" culverts $76,687.30 <br />Culvert subtotal <br /> <br /> $436,956.00 <br />Total Demolition <br /> <br /> <br />Notes: 1) CDMG, TR-O6 Liability Calculations, Task 037, 6/10/05 <br />2) Janet Binns, personal communiction, April 3, 2007 <br />3) Dave Winograski (certified MSHA electrician), personal communication, April 3, 2007 <br />4) Scott Dillon, Dillon Fencing and Contracting (fencing contractor used by HGTI), personal communication, September, 2007 <br /> <br />5) l.al JLUII LUdUCI l.uata, uvn, vu~ •r• ---- <br />M R-16 <br />23-2.5 <br />Revised 11/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.