My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-13_PERMIT FILE - C1992081A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081A
>
2008-03-13_PERMIT FILE - C1992081A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:24:58 PM
Creation date
6/4/2008 5:29:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
3/13/2008
Section_Exhibit Name
Tab 23 Bonding
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTER 23 <br />BONDING <br />The purpose of this section is to provide a reclamation cost estimate, with <br />supporting documentation, for determining the reclamation performance bond for <br />lands disturbed at the Hayden Gulch Loadout facility. The amount of bond <br />required was developed assuming that the bond would be forfeited and the <br />Colorado Division of Reclamation Mining and Safety (CDRMS) would assume the <br />reclamation liability. The bond calculation was developed by the Colorado <br />Division of Minerals and Geology (CDMG; the precursor to CDRMS) during their <br />adequacy review of Technical Revision No. 6 (TR-06), which was approved by the <br />CDMG in June 2005. This estimate covers the railcar load-in operational plan, <br />which has been approved but not implemented. Minor adjustments were calculated <br />by HGTI in consultation with CDRMS as part of MR-15 and MR-16. <br /> <br />The reclamation liability calculations, costs, and backup documentation for the <br />railcar load-in operational plan (e.g., TR-06) are located in Attachment 23-1 <br />Railcar Load-in Operations Bond Estimate Worksheets. The reclamation liability <br />calculations and costs for the railcar Loadout operational plan (e.g., original <br />operational plan and what is existing and on the ground) are presented in <br />Attachment 23-2, Railcar Loadout Operations Plan Reclamation Liability Estimate. <br />Reclamation Cost Categories <br />Experience in reclaiming lands has shown, for the purpose of estimating costs, <br />contract reclamation activities can be grouped into the following categories: <br />Direct Costs <br />1. Facility reclamation <br />2. Backfilling and grading <br />3. Topsoil replacement <br />4. Revegetation <br />5. Monitoring and maintenance <br />Indirect Costs <br />1. Mobilization and demobilization <br />2. Engineering redesign fee <br />MR-16 1 Revised 11/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.