Laserfiche WebLink
TAB 23 <br /> TABLE OF CONTENTS <br /> Page <br /> 1 <br /> Introduction <br /> Reclamation Cost Categories 1 <br /> 2 <br /> Facility Reclamation <br /> Structure Demolition 2 <br /> 2 <br /> Powerlines <br /> Miscellaneous Utilities 3 <br /> 3 <br /> Backfill and Grading <br /> 3 <br /> Facility Area <br /> 3 <br /> Sediment Ponds <br /> Road Reclamation 4 <br /> 4 <br /> Railroad <br /> 4 <br /> Finish Grading <br /> 4 <br /> Topsoil Replacement <br /> 4 <br /> Revegetation <br /> 5 <br /> Fences and Signs <br /> Ri11 and Gully Repair 5 <br /> 5 <br /> Fleet Determination <br /> Production Shifts 5 <br /> 5 <br /> Equipment Types <br /> Reclamation Time Frame 6 <br /> Mobilization and Demobilization Costs 6 <br /> 6 <br /> Indirect Costs <br /> Contractor Profit and Overhead 6 <br /> 6 <br /> Liability Insurance <br /> Contractors Performance Bond 6 <br /> Engineering Work/Bid Preparation Fee 7 <br /> Reclamation Management and Administration Fee 7 <br /> Reclamation Bond Calculation Summary Sheet 8 <br /> 10 <br /> Bonding Summary <br /> LIST OF ATTACHMENTS <br /> Attachment No. <br /> 23-1 Railcar Load-in Operations Bond Worksheets <br /> 23-2 Railcar Loadout Operations Plan Reclamation Liability Estimate <br /> i Revised 11/07 <br /> MR-16 <br />