Laserfiche WebLink
<br />Compensatory Actions Requested: <br />My awareness.of the underhanded and illegal extortion <br />that existed between mutiple parties acting outside the law <br />with respect to the destruction of the Joker Mill instilled in <br />me an unreasonable fear that a similar thing could happen at the <br />Ace #7 Mine and could lead to the unwarranted destruction of <br />facilities here. This fear was intentionally instilled by BLM <br />employees Rob Ernst and John Husband under the color of.offical <br />right, similar to that used in Robbins v. Willkie,et al. <br />In a seperate document, I am requesting a Jury Trial <br />to determine facts with respect to both the Ace #7 Mine Notice <br />of Noncompliance and the destruction of the Joker MIll. The jury <br />findings are to provide the factual basis, if any, for the correct <br />action in the appropriate venue for the dismissal of all BLM <br />employees involved in these two matters. The jury findings will <br />also set compensatory.damages for not having the Joker MIll <br />available to process my two million tons of ore, and due to the <br />precedent of Robbins v, Willkie,et al, where the BLM and others <br />involved were fully aware that they were doing something that was <br />not proper and obviously contrary to the mining laws, that the <br />Federal and State cloak of immunity be ripped. aside and that all <br />such employees involved be held fully acco4able for their actions <br />through personal financial liability. <br />Terry ank,ins, Plaintiff <br />P.O. Box 127, Baggs, WY 82321 <br />Phone 970 583 7342