Laserfiche WebLink
Chapter V <br /> 9 Finish Grade Entire Site 40,983 .00 <br /> 10 <br /> Sediment Pond Removal 28,133.68 <br /> 11 Replace Topsoil on 245 Acres 241.198.00 <br /> 12-13 Seal Portals and Fan Shafts 94,923.98 <br /> 14 Replace Topsoil on Sutey Pile 116,250.00 <br /> 15 Mobilization/Demobilization 5,568.28 <br /> 16 Partial Backfilling of Haul <br /> Roads for Decommissioning 369,577.80 <br /> 17 Backfill Rock Tunnel to <br /> Prep Plant Area 41,632.00 <br /> 18 Rough Grade Entire Site 78,872.00 <br /> 19 Backfill Light Use Roads 4,498.00 <br /> Total Direct Costs $2,431,531.60 <br /> Indirect Costs 561 ,433.77 <br /> Total 2,992,965.30 <br /> • Grand Total (rounded to nearest thousand) $2 ,993,000.00 <br /> Not all reclamation costs will occur after mining ceases. The <br /> following reclamation activities will be accomplished during the ' <br /> remainder of the life of the mine. <br /> -Interim reclamation of coal refuse piles <br /> I <br /> -Interim reclamation of haul road outs and fills <br /> -Interim reclamation of adit/tunnel refuse piles <br /> I <br /> -Reclamation of outslopes - adit/tunnel fill <br /> -Reclamation of any miscellaneous areas disturbed <br /> during the year. <br /> i <br /> 43 Revised 6/9,1 <br />