Laserfiche WebLink
Agency or organization name : DRMS <br />Permit or other job action : NEW APPLICATION <br />Task description : CUT SLOPE TO 3:1 <br />.... .... .......................................................................................................................................................................................... <br />HOURLY EQUIPME::..N...T <br />COST <br />Basic machine : Cat D8R Series ll - 8U (2005) Horsepower : 310 <br />Blade type : Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2: I-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $58.31 NA <br />Operating cost/hour : $77.43 100 <br />Ripper op. cost/hour : $3.40 40 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $171.91 Total fleet cost/hour : $171.91 <br />MATERIAL :::::::............................................................................................... <br />QUANTITIES .......................... ......................................................................... ........................... <br />Initial Swell Loose <br />volume : 5,437 CCY factor : 1.125 volume : 6,117 LCY <br />Source of estimated volume: EXHIBIT E <br />Source of estimated swell factor : EXHIBIT E <br /> <br />...... . . <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors <br />.. <br />Source <br />Average push distance : 250 feet <br />Unadjusted hourly production : 400.0 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 1.00 % (I <br />Average site altitude : 4,700 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth - Dry packed <br />Operator skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : 1.20 <br />Visibility: 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.02 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.50 <br />Adjusted unit production <br />Adjusted fleet production <br />198.39 <br />198.39 <br />HB) <br />(1 <br />(Cat HB) <br />LCY/hr <br />LCY/hr <br />.......................... <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 30.83 Hours <br />Unit cost : $0.867 /LCY Total job cost : $5,300