My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-22_PERMIT FILE - M2008014
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008014
>
2008-05-22_PERMIT FILE - M2008014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:31:53 PM
Creation date
5/23/2008 10:05:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008014
IBM Index Class Name
PERMIT FILE
Doc Date
5/22/2008
Doc Name
Cost Estimate/Cost Summary
From
DRMS
To
File
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : DRMS <br />Permit or other job action : NEW APPLICATION <br />Task description :APPLY 12 INCHES OF TOP SOIL OVER 10 ACRES <br />-XX <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series Il - 8U (2005) Horsepower : 310 <br />Blade type : Universal <br />Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2: I-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $58.31 NA <br />Operating cost/hour : $77.43 100 <br />Ripper op. cost/hour : $3.40 40 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $171.91 Total fleet cost/hour : $171.91 <br />MATERIAL QUANTITIES , <br />Initial Swell Loose <br />volume : 16,133 CCY factor : 1.125 volume : 18,150 LCY <br />Source of estimated volume: EXHIBIT E <br />Source of estimated swell factor : EXHIBIT E <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 250 feet <br />Unadjusted hourly production : 400.0 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 1.00 % (I <br />Average site altitude : 4,700 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth - Dry packed <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) <br />Material consistency : 0.90 (Cat <br />Dozing method : 1.20 (s/ <br />Visibility : 1.00 (av <br />Job efficiency : 0.83 (1 shit <br />Spoil pile : 0.80 (fnc <br />Push gradient : 1.02 (Cat <br />Altitude : 1.00 (Cat <br />Material weight : 0.90 (Cat <br />Blade type : 1.00 (S/s <br />Net correction : 0.50 <br />Adjusted unit production : 198.39 LCY/hr <br />Adjusted fleet production : 198.39 LCY/hr <br />Total job time : 91.49 Hours <br />Unit cost : $0.867 /LCY Total job cost : $15,728
The URL can be used to link to this page
Your browser does not support the video tag.