Laserfiche WebLink
-~ r $attle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />Apri12008 Monthly Report <br />Page 2 <br />Table 1- Apri12008 Ground Water Monitoring Well. and Lysimeter Depth to Water <br />Measurements <br />Monitoring Site Date Depth to Water (feet) <br />M-4R 4/30/08 0 <br />M-6 4/30/08 D <br />M-7 4/30/08 D <br />M-8 4/30/08 D <br />M-9 4/30108 142.96 <br />M-10 4/30/08 25.46 <br />M-11 R 4/30/08 42.45 <br />M-12 4/30/08 178.35 <br />M-13R 4/30/08 129.75 <br />M-14 4/30/08 135.18 <br />M-15 4/30/08 83.02 <br />M-16 4/30/08 22.62 <br />M-19 4/30/08 24.89 <br />M-21 4/30/08 19.01 <br />M-22 4/30/08 17.33 <br />M-26 4/30/08 16.05 <br />M-32 4/30/08 43.19 <br />M-33 4/30/08 47.11 <br />M-34 4/30/08 23.33 <br />BF-4 4/30/08 24.89 <br />BF-6 4130/08 30.87 <br />LS-1 4/30/08 D <br />LS-2 4/30/08 D <br />LS-3 4/30/08 D <br />LD-] 4/30/08 D <br />LD-2 4/30/08 D <br />LD-3 4/30/08 D <br />Table 2 -April 2008 Tailing Disposal Area Piezometer Depth to Water <br />Piezometer Date Depth to Water <br />feet Total Depth (ft) Volume of <br />Water ft <br />P6 4/30108 D 72.46 0.00 <br />P7 4/30/08 D 92.50 0.00 <br />P8 4/30/08 96.62 97.51 0.89 <br />P9 4/30/08 71.81 72.30 0.49 <br />P10 4/30/08 57.88 58.30 0.42 <br />Pll 4/30/08 40.96 41.80 4.84 <br />