Laserfiche WebLink
` 'Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />April 2008 Monthly Report <br />Page 3 <br />Table 2 April 2008 Tailing Disposal Area Piezometer Depth to Water <br />Measurements (continued) <br />Piezometer Date Depth to Water <br />feet Total Depth (ft) Volume of <br />Water ft <br />P12 4/30/08 41.04 41.71 0.67 <br />P13 4130/08 40.91 41.34 0.43 <br />P14 4/30/08 D 41.24 0.00 <br />P15 4/30/08 41.10 0.00 <br />Table 3 below provides the calendar year 2008 sludge management for the San Luis site. <br />Table 3 -Water Treatment Plant Sludge Management Year to Date. <br />Date Quantity Sledge Management <br />October 2007 Sludge transferred from Pond #3 to drying <br />ad. <br />Should you have any questions or comments, please do not hesitate to contact either myself (719) <br />379-0798 or Mr. Bill Lie (303) 324-2630 or (970) 325-4482. <br />~n erely, <br />u io F. Madrid <br />nvironmental Coordinator III <br />Cc: Bill Lyle <br />File <br />