My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-12_HYDROLOGY - M1988112
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1988112
>
2008-05-12_HYDROLOGY - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:31:28 PM
Creation date
5/13/2008 12:35:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
HYDROLOGY
Doc Date
5/12/2008
Doc Name
April 2008 Monthly report
From
Battle Mountain Resources, Inc.
To
DRMS
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BATTLE MOUNTAIN RESOURCES, INC. ~~ <br />~c S <br />May 08, 2008 <br />Mr. Allen Sorensen <br />State of Colorado <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />w~~ ~ <br />~~~fl~~~ <br />MAY 12 2008 <br />Division of keclamation, <br />Mining and Safety <br />Re: Battle Mountain Resources lnc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />April 2008 Monthly Report ~ <br />Dear Mr. Sorensen: <br />The following summarizes monitoring and site activities at the Battle Mountain Resowces Inc. <br />(BMRI), San Luis Project for the month of March 2008. <br />Surface and ground water monitoring and analysis were completed for all required sites during <br />the month per the terms and conditions of the TR-32 Quality Assurance and Quality Control <br />(QA/QC) plan. <br />Vacuum on the tailing lysimeters was verified on April 30~', no water was present for sampling <br />and subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezometers and <br />the West Pit monitoring wells on April 30'x. April tailing impoundment piezometer measurements <br />identified these installations were either dry or contained less than 12 inches of water as <br />illustrated in Table 2. Tables 1 and 2 below identify the depth to water measwements collected <br />for each of the site monitoring wells, piezometers and lysimeters as required by the terms and <br />conditions of the TR-32 QA/QC plan. <br />The leak detection system was measwed on April 30`x. A total of 950 gallons of water was <br />excavated from the leak detection system yielding a monthly average of 31.66 gpad. The tailings <br />pond under-drain measured 42 gpm. <br />During April the West Pit water treatment plant operated efficiently discharging a total of <br />9,553,600 gallons (29.32 acre-feet) of water to Rito Seco Creek and a total of 811,200 gallons <br />(2.49 acre-feet) of water was transferred from the water treatment plant to the tailings <br />impoundment. Seepage along Rito Seco Creek remained dry during the month. <br />P.O. Box 310 San Luis, Colorado 81152-0310 (719) 379-0798 Fax (719) 379-0713 <br />
The URL can be used to link to this page
Your browser does not support the video tag.