My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-31_REPORT - M1988112
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1988112
>
2008-03-31_REPORT - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:17:54 AM
Creation date
4/10/2008 10:07:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
REPORT
Doc Date
3/31/2008
Doc Name
Annual Fee/Report/Map
From
Battle Mountain Resources, Inc.
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Luis Project <br />CDMG Annual Report <br />March 23, 2008 <br />Page 4 <br />The tailing embankment piezometers were inspected monthly. Each of these installations either <br />remained dry or contained less than 12 inches of accumulated water within the piezometer casing. <br />Results of these inspections were reported to the Division in the monthly reports. <br />The collection pond leak detection system was evacuated monthly and quarterly sampled and <br />analyzed in accordance with the applicable technical revision monitoring plan. Laboratory <br />analytical reports were submitted to the Division upon receipt from the Laboratory. The 2007 <br />collection pond leak detection system return flow rates ranged from 16.06 to 31.48 GPAD with a <br />mean annual collection pond return flow rate of 21.47 GPAD. <br />Water treatment plant sludge removal was conducted twice during the 2007 calendar year. <br />Approximately 386 tons of sludge material was transported from the water treatment plant to the <br />tailing facility during 2007. This material was extracted from the water treatment plant ponds <br />and transported to the tailing disposal facility for final placement. The November 2007 monthly <br />report summarizes the 2007 sludge management activities. <br />Technical Revisions <br />BMRI continued implementation of TR-26 as approved on May 23, 2000. BMRI has been <br />actively managing the West Pit and Rito Seco alluvial hydrologic systems since July 1999, and <br />the water management plan developed in TR-26 has been fully implemented accordingly. The <br />water management techniques employed since the submission of TR-26 to the Division has <br />reversed and maintained the West Pit hydrologic gradient at a ground water elevation (8582 ft <br />amsl) below the Rito Seco streambed channel since February 8, 2000 eliminating any surface <br />water expressions. Ground water recovery wells M-32 and M-33 installed during calendar year <br />2000 to capture and remove contaminates contained in the Rito Seco alluvial ground water <br />system continued to be operated throughout calendar year 2007. Ground water recovered from <br />theses wells was pumped back to the West Pit water treatment plant, treated and discharged in <br />accordance with the Colorado Department of Public Health and Environment discharge permit. <br />Ground water elevations in the vicinity of these wells were maintained below an elevation of <br />8540 ft amsl to ensure ground water capture and prevent downgradient migration of any <br />contaminates contained in the Rito Seco alluvial ground water system. Each of these actions has <br />substantially improved the West Pit and Rito Seco alluvial ground water quality. <br />A total of 107,488,200 gallons (329.89 acre-feet) of ground water was extracted from the West <br />Pit and 7,194,500 gallons (22.08 acre-feet) of Rito Seco alluvial ground water was extracted and <br />delivered to the water treatment plant during calendar year 2007. Of this water, 99,444,100 <br />gallons (305.24 acre-feet) of water was treated and delivered to Rito Seco Creek in accordance <br />with the Colorado Department of Public Health and Environment discharge permit and TR-26. A <br />total of 8,611,200 gallons (26.42 acre-feet) of water treatment plant reject concentrate water was <br />transferred to the tailing facility from the water treatment plant during calendar year 2007. This <br />water was applied within the lined tailing facility to irrigate revegetation in accordance with TR- <br />30. <br />
The URL can be used to link to this page
Your browser does not support the video tag.