My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-14_PERMIT FILE - M2008014
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008014
>
2008-03-14_PERMIT FILE - M2008014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:25:13 PM
Creation date
3/14/2008 3:50:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008014
IBM Index Class Name
PERMIT FILE
Doc Date
3/14/2008
Doc Name
New Application
From
Halde Sand & Gravel, Inc.
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Halde Sand $ Gravel, Inc. <br />Regular 112 Permit Application <br />Halde Pit <br />EXHIBIT E - RECLAMATIONPLAN <br />(a) Description of the type of reclamation, why chosen, acreage accorded to each, <br />reclamation as related to earthmoving. <br />The entire pit area will be reclaimed as rangeland. This is consistent with the pre-mining <br />land use and most of the land within a few miles of the site. <br />The earthmoving in reclamation will be relatively simple. Little or no overburden is <br />involved beyond the topsoil material. It is possible that a small quantity of fines will be <br />backfilled along the base of the slopes or on the mine floor prior to redistribution of the <br />topsoil material. The site will be graded and seeded to complete the reclamation. <br />(b) Comparison of the proposed post mining land use to other land uses in the vicinity <br />And to adopted state and local land use plans and programs. <br />As stated above, rangeland is the applicant and Lessors' choice for reclamation. There are <br />no enacted land use programs in the area that would affect this operation. <br />(c) Description of how the reclamation plan will be implemented to meet applicable <br />requirements. <br />All applicable requirements for reclamation will be followed and are outlined within the <br />reclamation plan. <br />(d) Plans for topsoil segregation, preservation, and replacement; for stabilization, <br />compaction, and grading. <br />All the topsoil and any overburden will be stockpiled. The stockpiled materials will be <br />compacted to prevent erosion. If stockpiles are left for more than one growing season a <br />growth medium will be planted to prevent any further erosion that might occur from the <br />elements. <br />(e) Schedule indicating how reclamation will be implemented. <br />It is anticipated that within the next couple of years when the deposits are depleted from the <br />pit reclamation will begin with the final grading. The side slopes will be graded to 3:1 or <br />flatter in the course of mining. Many of the surrounding rangeland slopes are much steeper <br />and with good grazing practices will do well. As soon as final grading and backsloping are <br />complete the final seeding will be done. Of course it is hard to determine the exact time the <br />reclamation will commence. The availabilty of material will be the deciding factor as to <br />when reclamation will begin. The area will be mined in 10 acre phases for approximately 4 <br />year period. We will continue to mine until material is depleted and the area will be <br />reclaimed in approximately the St" year. <br />
The URL can be used to link to this page
Your browser does not support the video tag.