My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-22_APPLICATION CORRESPONDENCE - C2008086 (39)
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2008086
>
2008-02-22_APPLICATION CORRESPONDENCE - C2008086 (39)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:23:08 PM
Creation date
3/11/2008 12:37:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2008086
IBM Index Class Name
Application Correspondence
Doc Date
2/22/2008
Doc Name
PDEIS Chapter 4 Environmental Consequences and Mitigation
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTERFOUR Environmental Consequences and Mitigation <br />Water Pipeline <br />The water pipeline would be buried along the railroad spur alignment. It would extend to a water <br />tank located at the Red Cliff Mine site above the portal level. A smaller water tank would also <br />be constructed near the coal preparation plant. <br />The proposed pipeline would traverse approximately 9.5 miles of BLM-administered land, and <br />approximately 5 miles of private land. Use of federal lands will require CAM to obtain ROW <br />grants on these federal lands. <br />Existing land use along the pipeline corridor is the same as described in the Railroad section. <br />The water pipeline crosses BLM-administered lands and private lands under the jurisdiction of <br />Mesa County. Compliance with these land use plans is the same as addressed in the Railroad <br />section. <br />Transmission Line <br />Existing land uses within the proposed transmission line ROW consist of mineral exploration <br />and production facilities, oil and gas development and extraction, livestock grazing, <br />transportation and utility corridors, water control management by the Bureau of Reclamation <br />(BOR), dispersed and developed recreation, agriculture, irrigated farmland, wildlife use, and <br />low-density single family residential development within rural private land parcels. <br />The proposed transmission line would cross 7.1 miles of BLM lands and would not cross any <br />private land ownership north of the Highline Canal. South of the Highline Canal, the proposed <br />transmission line would be adjacent to 95 private parcels of land, and would not cross any <br />private parcels of land. Table 4-1 shows the approximate number of private parcels located <br />adjacent to the transmission line, and the approximate number of parcels crossed by the <br />transmission line. Alternatives A, B, and C are discussed later. An underbuild distribution line <br />would be constructed in areas with existing distribution lines south of the Highline Canal. New <br />transmission lines would be constructed along existing county road easements on private lands <br />also south of the Highline Canal, and new rights-of--way would be secured for construction of <br />new transmission lines on BLM-administered lands. Purchasing easements from private <br />landowners would not be necessary, as the proposed transmission line does not cross any <br />privately owned parcels of land north of the Highline Canal. <br />Table 4-1: Transmission Line Impacts To Private Land Parcels <br />Transmission Line Number of Private Parcels <br />Adjacent to Transmission Line* Number of Private Parcels <br />Crossed by Transmission Line <br />Proposed 69kV Line 95 0 <br />Alternative A 90 19 <br />Alternative B 82 5 <br />Alternative C 96 0 <br />Source: Mesa County Assessor, 2008 <br />*South of the Highline Canal <br />4-4 <br />DBMS 559 <br />
The URL can be used to link to this page
Your browser does not support the video tag.