My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-27_PERMIT FILE - M2008010
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008010
>
2008-02-27_PERMIT FILE - M2008010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:23:34 PM
Creation date
2/28/2008 11:17:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008010
IBM Index Class Name
PERMIT FILE
Doc Date
2/27/2008
Doc Name
New 112c Application
From
McStone Aggregates, LLC
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mud Creek Pit -Reclamation Permit Application - 112 (C) Exhibits Page 16 of 67 <br />loaded directly from ouffeed conveyor stockpiles to haul off-site or to Plant Sites A and B. These sites will <br />have aggregate stockpiles for production of ready-mix and asphaltic cement concrete only immediately <br />before and when plants are present and operating. Material stockpiles will not be placed directly on un- <br />stripped/undisturbed land. <br />GENERAL: Stockpile areas are placed where the material will be available for reclamation as planned with <br />minimum movement and re-handling. There may be some very temporary stockpiles for topsoil and excess <br />material, located at various convenient locations along roads, on the floor of the pit, in the plant area, or in <br />stripped areas. The use ofsilt-fencing at the toe of stockpiles will be avoided as much as possible, but <br />sediment control may be provided by shallow swales at the toe. <br />TABLE D-8-4. LONGTERM SOIL STOCKPILE AREAS <br /># Area Volume Tyke Period of use Period of Use of material <br /> acres ~ material removal <br />A-1 0.28 10,000 Topsoil Permanent Only as sold Berms for plant site and sale <br /> until used material <br />B-1 0.67 16,100 Topsoil Permanent Not planned Berms for plant site and sale <br /> until used material <br />Tot 0.95 26,100 <br />See Figure D-2 for locations of stockpiles A-1 and B-1. <br />SECTION D-9. SURFACE WATER MANAGEMENT: <br />WATER AND DRAINAGE: during each phase, the working face will move to the North-Northeast. In Phase II, the pit <br />will daylight along the northern permit boundary, but will be cut deeply enough to prevent runoff from the pit across <br />the boundary to the adjacent property3. Years 1-4 areas will flow to the Southwest and Plant Site A. Years 5-8 areas' <br />flow will split: some will flow to the west and Plant Site B, the rest to the east and a detention and sedimentation <br />basin in the Northeast corner of Year 8. Year 9 will have its own internal flow to the West and a small infiltration/ <br />sedimentation basin. Years 10-20 will flow to the Southwest and Plant Site A. Both plant sites will have <br />detention/sediment basins. Drainage through reclaimed areas will be a permanent part of final reclamation. <br />Temporary structures (swales and berms) will be constructed on the floor of the pit and in stripped areas to (1) <br />prevent erosion, (2) divert water from active mining areas and (3) convey water to reclamation and long-term <br />stockpile areas, or to a discharge point orsediment/infiltration basin. The goal is to prevent any surface discharge of <br />water from disturbed areas which have not been reclaimed. The drainage from the active areas will be controlled and <br />treated as required by water quality regulations4 and permits to ensure that no sediment from the pit is discharged <br />into Mud Creek. <br />The pit floor and plant site floors are below the surrounding land and there will be no discharge under normal <br />conditions from these areas during mining. Mud Creek is not a rated fishery, so it is not expected that discharge <br />temperature regulation may be required. <br />No dewatering is anticipated, as ground flow through undisturbed mineable material on the sides of the pit will <br />continue. Prevention or significant limits on surface discharge will minimize erosion, sedimentation, and traffic <br />problems. As necessary, stockpiles may have perimeter ditches/swales and berms with silt fence, straw bales, or <br />rock check dams, to reduce/prevent sediment in any runoff, and reduce soil loss. <br />3 Except under controlled conditions. <br />4 This is described in the surface water management plan prepared for the CDPS permit, which provides detailed information. <br />McStone Aggregates, LLC 15 FEB 2008 ©WASTELINE, INC 2008 PN 5006.1-4(009) <br />
The URL can be used to link to this page
Your browser does not support the video tag.