My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-07_PERMIT FILE - M2007044
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2007044
>
2008-02-07_PERMIT FILE - M2007044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:22:24 PM
Creation date
2/13/2008 11:48:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
PERMIT FILE
Doc Date
2/7/2008
Doc Name
Initial reclamation liability estimate
From
DRMS
To
Energy Fuels Resources Corp.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Terry Tunnel <br />' Rent two 9 cu.ft. mixers $ 500.00 per month <br />' Rent auger feed $ 250.00 per month <br />' Rent concrete pump $ 2,000.00 per month <br />' Rent concrete pipe and hose $ 350.00 per month <br />' Concrete vibrator $ 60.00 per month <br />' Rent roller conveyors $ 250.00 per month <br />' Concrete $ 6,679.00 material cost <br />' Delay set $ 248.00 each <br />' Plasticizer $ 136.00 each <br />' Type V cement $ 280.00 each <br />' Meals during pour $ 345.00 each <br />Note: Increase factor of 20%will be used because a shorter rental will be a higher cost per time <br />Pack Rat Contingency Bulkhead Ter ry Tunnel price Price Facto r Size Factor <br />' Rent 9 cu.ft. mixers $ 62.50 per week 2 week 1.5 1.2 $ 225.00 <br />' Rent auger teed $ 62.50 per week 2 week 1.5 1.2 $ 225.00 <br />' Rent concrete pump $ 500.00 per week 2 week 1.5 1.2 $ 1,800.00 <br />' Rent concrete pipe and hose $ 87.50 per week 2 week 1.5 1.2 $ 315.00 <br />' Concrete vibrator $ 15.00 per week 2 week 1.5 1.2 $ 54.00 <br />' Rent roller conveyors $ 62.50 per week 2 week 1.5 1.2 $ 225.00 <br />' Concrete $ 6,679.00 material cost 1.5 0.21 $ 2,103.89 <br />' Delay set $ 248.00 each 1.5 0.21 $ 78.12 <br />' Plasticizer $ 136.00 each 1.5 0.21 $ 42.84 <br />' Type V cement $ 280.00 each 1.5 0.21 $ 88.20 <br />'Meals during pour $ 345.00 each 1.5 0.21 $ 108.68 <br /> Subtotal 5 5,265.72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.