Laserfiche WebLink
Terry Tunnel <br />' Grout mixer and pump $ 250.00 per week <br />' Packers $ 480.00 each <br />' Type V cement $ 112.00 each <br />Pack Rat Contingency Bulkhead Terry Tunnel Pnce <br />'Grout mixer and pump $ 250.00 per week <br />' Packers $ 480.00 each <br />' Type V cement $ 112.00 each <br />Terry Tunnel <br />' Engineering design $ 4,538.00 each <br />' Engineering Inspections $ 2,077.00 each <br />' Material Testing $ 168.00 each <br />' Miscellaneous small hand tool usage $ 3,000.00 each <br />' Miscellaneous materials (nails, bits, wire, etc.) $ 3,000.00 each <br />' Diesel $ 1,500.00 each <br />' Electricity $ 5,000.00 per month <br />' Satety supplies $ 1,000.00 each <br />' Intake screen, bypass pipe $ 200.00 each <br />2 weeks <br />Price Factor Size Factor <br />2 weeks 1.5 $ 750.00 <br />1.5 1.05 $ 756.00 <br />1.5 1.05 $ 176.40 <br /> Subtotal S 1,682.40 <br />