Laserfiche WebLink
Note: Reduction factor of 0.7 will be used for items that apply because of less head, less materials, less <br />complex: a reduction factor of 0.5 will be used for Safety supplies because they will be used for half as long, a <br />the engineering design for the Pack Rat Contingency Bulkhead will be very similar to the Whirlwind Decline <br />Bulkhead so a reduction factor of 0.5 will be used <br />Pack Rat Contingency Bulkhead Terry Tunnel Price Price Factor Size Factor <br />' Engineering design $ 4,538.00 each 1.5 0.5 $ 3,403.50 <br />` Engineering Inspections $ 2,077.00 each 1.5 $ 3.115.50 <br />'Material Testing $ 168.00 each 1.5 $ 252.00 <br />' Miscellaneous small hand tool usage $ 3,000.00 each 1.5 1.07'0.7 $ 1,011.15 <br />' Miscellaneous materials (nails, bits, wire, etc.) $ 3,000.00 each 1.5 1.07'0.7 $ 1,011.15 <br />' Diesel $ 1,500.00 each 3 0.7 $ 3,150.00 <br />' Electricity $ 1,250.00 per week 2 weeks 1.5 $ 3,750.00 <br />'Safety supplies $ 1,000.00 each 1.5 0 5 $ 750.00 <br />' Intake screen, bypass pipe $ 200.00 each 1.5 $ 300.00 <br /> Subtotal E 16,743.30 <br />Terry Tunnel <br />' Generator $ 800.00 each <br />' Fan $ 3,000.00 each <br />' Flatbed truck and loader $ 700.00 each <br />' Contractor install $ 6,400.00 each <br />' Vent bag $ 4,755.00 each <br />Pack Rat Contingency Bulkhead Terry Tunnel Price Price Factor Size Factor <br />' Generator $ 800.00 each 1.5 $ 1,200.00 <br />'Fan $ 3,000.00 each 1.5 $ 4,500.00 <br />' Flatbed truck and loader $ 700.00 each 1.5 $ 1,050.00 <br />'Contractor install $ 6,400.00 each 1.5 1.25 $ 12,000.00 <br />' Vent bag $ 4,755 00 each 1.5 1.25 $ 8,915.63 <br /> Subtotal S 27,665.63 <br />Subtotal Supplies, Equipment, and Engineering, includes overhead and profit $ 57.426.51 <br />Add 5% DRMS administration required by statute $ 2,871.33 <br />Supplies, Equipment, and Engineering Component of Bulkhead Bond <br />