C) Other Eguiament Costs. not including Overhead and Profi t <br />Task and Cost Item Quantity <br />l Site Cleanin <br />1) Initi <br />g <br />a <br />Terry Tunnel <br />' Two yard Load Haul Dump $ 45.00 per hr 10.5 hrs. <br />Pack Rat Contingency Bulkhead Terry Tunnel Price <br />' 1.25 yard Load Haul Dump $ 35.00 per hr 10.5 hrs. <br />Note: 1.25 yard LHD will bee on site for Bulkhead building. <br />2~:S~ f~tiebar Anchors and Fine Site Cleaning <br />Terry Tunnel <br />' 1.25 yard Load Haul Dump $ 35.00 per hr 10.5 hrs. <br />Pack Rat Contingency Bulkhead Terry Tunnel Price <br />' 1.25 yard Load Haul Dump $ 35.00 per hr 10.5 hrs. <br />J Buik) Forms. Set Valves, and Rebar. Divert Water. <br />Terry Tunnel <br />' 1.25 yard Load Haul Dump $ 35.00 per hr 85.6 hrs. <br />Note: Due to the less head at Pack Rat Contingency Bulkhead, less thickness, and no <br />valves a reduction factor of 0.6 will be used as well as only 3 laborers inside. <br />Pack Rat Contingency Bulkhead Terry Tunnel Price <br />' 1.25 yard Load Haul Dump $ 35.00 per hr 85.6 hrs. <br />41 Set ua and Pour Bulkheads <br />Terry Tunnel <br />' 1.25 yard Load Haul Dump $ 35.00 per hr 21 hrs. <br />' Forklift $ 20.00 per hr 21 hrs. <br />Pack Rat Contingency Bulkhead Terry Tunnel Price <br />• 1.25 yard Load Haul Dump $ 35.00 per hr 21 hrs. <br />' Forklift S 20.00 per hr 21 hrs. <br />Extended Cost <br />Price Factor Size Factor <br />1.5 $ 551.25 <br />Price Factor Size Factor <br />1.5 $ 551.25 <br />Price Factor Size Factor <br />1.5 0.6 $ 2,696.40 <br />Price Factor Size Factor <br />1.5 $ 1,102.50 <br />1.5 $ 630.00 <br />