My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-07_PERMIT FILE - M2007044
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2007044
>
2008-02-07_PERMIT FILE - M2007044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:22:24 PM
Creation date
2/13/2008 11:48:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
PERMIT FILE
Doc Date
2/7/2008
Doc Name
Initial reclamation liability estimate
From
DRMS
To
Energy Fuels Resources Corp.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C) Other Eguiament Costs. not including Overhead and Profi t <br />Task and Cost Item Quantity <br />l Site Cleanin <br />1) Initi <br />g <br />a <br />Terry Tunnel <br />' Two yard Load Haul Dump $ 45.00 per hr 10.5 hrs. <br />Pack Rat Contingency Bulkhead Terry Tunnel Price <br />' 1.25 yard Load Haul Dump $ 35.00 per hr 10.5 hrs. <br />Note: 1.25 yard LHD will bee on site for Bulkhead building. <br />2~:S~ f~tiebar Anchors and Fine Site Cleaning <br />Terry Tunnel <br />' 1.25 yard Load Haul Dump $ 35.00 per hr 10.5 hrs. <br />Pack Rat Contingency Bulkhead Terry Tunnel Price <br />' 1.25 yard Load Haul Dump $ 35.00 per hr 10.5 hrs. <br />J Buik) Forms. Set Valves, and Rebar. Divert Water. <br />Terry Tunnel <br />' 1.25 yard Load Haul Dump $ 35.00 per hr 85.6 hrs. <br />Note: Due to the less head at Pack Rat Contingency Bulkhead, less thickness, and no <br />valves a reduction factor of 0.6 will be used as well as only 3 laborers inside. <br />Pack Rat Contingency Bulkhead Terry Tunnel Price <br />' 1.25 yard Load Haul Dump $ 35.00 per hr 85.6 hrs. <br />41 Set ua and Pour Bulkheads <br />Terry Tunnel <br />' 1.25 yard Load Haul Dump $ 35.00 per hr 21 hrs. <br />' Forklift $ 20.00 per hr 21 hrs. <br />Pack Rat Contingency Bulkhead Terry Tunnel Price <br />• 1.25 yard Load Haul Dump $ 35.00 per hr 21 hrs. <br />' Forklift S 20.00 per hr 21 hrs. <br />Extended Cost <br />Price Factor Size Factor <br />1.5 $ 551.25 <br />Price Factor Size Factor <br />1.5 $ 551.25 <br />Price Factor Size Factor <br />1.5 0.6 $ 2,696.40 <br />Price Factor Size Factor <br />1.5 $ 1,102.50 <br />1.5 $ 630.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.