51 Sirio Forms, Move Eauioment and Grout Bulkhead <br />Terry Tunnel <br />' 125 yard Load Haul Dump $ 35.00 per hr 120 hrs. <br />Note: Reduction factor for leaving the forms in place 0.8 <br />Pack Rat Contingency Bulkhead Terry Tunnel Price <br />' 1.25 yard Load Haul Dump $ 35.00 per hr 100 hrs. <br />6) Miscellaneous Costs <br />Terry Tunnel <br />' Compressor usage $ 3,000.00 each <br />' Air Bean 25 pump usage $ 1,200.00 each <br />' Flight 123 HP pump usage <br />' $ 1,620.00 each <br />GD 83 iackleg $ 1,125.00 each <br />` Outside loader $ 6,000.00 each <br />Note: A reduction factor of 0.5 will be used because less material will be moved and less work will be done and a <br />short rental period factor of 20% will be used <br />Pack Rat Contingency Bulkhead Terry Tunnel Price <br />' Compressor usage $ 3,000.00 each <br />' Air Bean 25 pump usage Not used at Pack Rat Contingency <br />' Flight 123 HP pump usage Not used at Pack Rat Contingency <br />` GD 83 jackleg $ 1,125.00 each <br />'Outside loader $ 6.000.00 each <br />Subtotal Other Egwpment, not including overhead and profit <br />Ovefiead and profit@13.07% <br />Subtotal <br />Add 5% DRMS administration required by statute <br />Other Equipment Component of Bulkhead Bond <br />Bond Amount for Pack Rat Contingency Bulkhead <br />Supplies, Equipment, and Engineering <br />Other Equipment <br />Total <br />Price Factor Size Factor <br />1.5 1.07 $ 5,617.50 <br />Price Factor Size Factor <br />1.5 0.5'1.2 $ 2,700.00 <br />1.5 0.5'1.2 $ 1,687.50 <br />1.5 0.5'1.2 $ 5,400.00 <br />$ 20,936.40 <br />$ 2,736.39 <br />$ 23.672]9 <br />$ 1.183.64 <br />S 24,856.43 <br />$ so,aoo.21 <br />$ 24.856.43 <br />S 115,256.64 <br />