My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-07_PERMIT FILE - M2007044
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2007044
>
2008-02-07_PERMIT FILE - M2007044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:22:24 PM
Creation date
2/13/2008 11:48:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
PERMIT FILE
Doc Date
2/7/2008
Doc Name
Initial reclamation liability estimate
From
DRMS
To
Energy Fuels Resources Corp.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Note: Reduction factor of 0.7 will be used because of les s head, less materials, less complex <br />Pack Rat Contingency Bulkhead Terry Tunnel price Red uction Factor Price Facto r Size Factor <br />' 8"x8"x16' timbers $ 2.196.00 each 0.7 1.5 1.07 $ 2,467.21 <br />' 2"x6"x14' timbers $ 381.00 each 0.7 1.5 1.07 $ 428.05 <br />' 2"x12"x14' timbers $ 150.00 each 0.7 1.5 1.07 $ 168.53 <br />' 8" DRISCO pipe w/ flanges Not used at Pack Rat Coi <br />' #9 rebar $ 928.00 each 0.7 1.5 1.07 $ 1,042.61 <br />' #6 rebar $ 128.00 each 0.7 1.5 1.07 $ 143.81 <br />'Concrete Block (pipe support) $ 252.00 each 0.7 1.5 $ 264.60 <br />' 6" stainless bypass pipe Not used at Pack Rat Coi <br />1 <br />1 <br />6'/8" <br />$ <br />78 <br />129 <br />' 1" stainless monitoring pipe $ 618.00 each 0.7 .5 . . <br />' 6" stainless gate valve Not used at Pack Rat Coi <br />' Miscellaneous bolt packages and gaskets $ 155.00 each 0.7 1.5 $ 162.75 <br />' Freight $ 200.00 each 0.7 1.5 $ 210.00 <br /> Subtotal E 5,017.33 <br />Terry Tunnel <br />' Equipment: Welder and torch $ 200.00 each <br />' Angle Iron $ 296.00 each <br />' #8 thread bar $ 163.00 each <br />' #8 bevel and flat washers $ 71.00 each <br />' 2" schedule 20 pipe $ 148.00 each <br />' Celtite $ 81.00 each <br />Note: Reduction factor of 0.7 will be used because of less head, less materials, less complex <br />Pack Rat Contingency Bulkhead Terry Tunnel price Reduction Factor Price Factor Size Factor <br />' Equipment: Welder and torch $ 200.00 each 0.7 1.5 1.07 $ 210.00 <br />'Angle Iron $ 296.00 each 0.7 1.5 1.07 $ 310.80 <br />' #8 thread bar $ 163.00 each 0.7 1.5 1.07 $ 171.15 <br />' #8 bevel and flat washers $ 71.00 each 0.7 1.5 1.07 $ 74.55 <br />' 2" schedule 20 pipe $ 148.00 each 0.7 1.5 1.07 $ 155.40 <br />' Celtite $ 81.00 each 0.7 1.5 1.07 $ 85.05 <br /> Subtotal b 1,006.95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.