My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-07_PERMIT FILE - M2007044
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2007044
>
2008-02-07_PERMIT FILE - M2007044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:22:24 PM
Creation date
2/13/2008 11:48:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
PERMIT FILE
Doc Date
2/7/2008
Doc Name
Initial reclamation liability estimate
From
DRMS
To
Energy Fuels Resources Corp.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Terry Tunnel, general labor 40 hrs. <br />Pack Rat Contingency Bulkhead Terry Tunnel Hours Factor <br />General labor @ $ 26.91 per hr. 40 1.25 hr/hr $ 1,345.53 <br /> Subtotal S 1,345.53 <br />Subtotal Labor, includes overhead and profit $ 28.668.93 <br />Add 5% DRMS administration regwred by statute $ 1,433.45 <br />Labor Component of Bulkhead Bond Subtotal <br />Task and Cost Item Quantit Extended Cost <br /> <br />Terry Tunnel <br />' Sand Blaster $ 20.00 per day 3 days <br />' Non-shrink grout. 1-bag $ 10.16 per bag 1 bag <br />' Sand blaster sand, 30# grit, 100 Ib. bag $ 7.36 per bag 3 bag <br /> Terry T unnel price Terry Tunne l Quantity Price Factor Size Factor <br />Pack Rat Contingency Bulkhead <br />' Sand Blaster $ 20.00 per day 3 days 1.5 0.21 $ 18.90 <br />' Non-shrink grout, 1-bag $ 10.16 per bag 1 bag 1.5 $ 15.24 <br />'Sand blaster sand, 30# grit. 100 Ib. bag $ 7.36 per bag 1 bag 1.5 $ 11.04 <br /> Subtotal 3 45.18 <br /> <br />Terry Tunnel <br />' 8"x8"x16' timbers $ 2,196.00 each <br />' 2"x6"x14' timbers $ 381.00 each <br />' 2"x12"x14' timbers $ 150.00 each <br />' 8" DRISCO pipe w/ flanges $ 420.00 each <br />• #9 rebar $ 928.00 each <br />' #6 rebar $ 128.00 each <br />Concrete Block (pipe support) $ 252.00 each <br />6" stainless bypass pipe $ 2,250.00 each <br />' 1" stainless monitoring pipe $ 618.00 each <br />' 6" stainless gate valve $ 3,986.00 each <br />' Miscellaneous bolt packages and gaskets $ 155.00 each <br />' Freight $ 200.00 each <br />
The URL can be used to link to this page
Your browser does not support the video tag.