Laserfiche WebLink
<br />Terry Tunnel, General labor <br />Terry Tunnel, Welder <br />Pack Rat Contingency Bulkhead, General labor <br />Pack Rat Contingency Bulkhead, Welder <br />Pack Rat Contingency Bulkhead <br />3 laborer inside @ $ 26.91 per hr. <br />1 laborer outside @ $ 26.91 per hr. <br />1 welder @ $ 47.49 per hr. <br />Terry Tunnel, General labor <br />Terry Tunnel, Overtime during pour <br />Terry Tunnel, salary (management) during pour <br />Terry Tunnel, contract labor for pour <br />Terry Tunnel, outside man <br />Pack Rat Contingency Bulkhead <br />General labor @ $ 26.91 per hr. <br />Overtime during pour <br />Salary (management) during pour <br />Contract labor for pour <br />Outside man @ $ 26.91 per hr. <br />Terry Tunnel, general labor <br />Note: Reduction factor for using less bulky forms 0.8 <br />Pack Rat Contingency Bulkhead <br />General labor @ $ 26.91 per hr <br />40 hrs. <br />20 hrs. <br />Terry Tunnel Hours Factor <br />40 1.07 hr/hr <br />20 1.07 hr/hr <br />42.8 hrs. <br />42.8 hrs. <br />21.4 hrs. <br />890 hrs. <br />$ 2,157.30 <br />$ 2,987 05 <br />$ 864.00 <br />1ao nrs. <br />Terry Tunnel Hours <br />890 <br />$ 2,157.30 <br />$ 2.987.05 <br />$ 864.00 <br />100 <br />$ 4,607.10 <br />$ 1,151.78 <br />$ 1,016.27 <br />Subtotal S 6,775.15 <br />Factor <br />0.21 hr/hr $ 5.029.60 <br />0.21 hr/hr $ 453.03 <br />0.21 hr/hr $ 627.28 <br />0.21 hr/hr $ 181.44 <br />0.21 hr/hr $ 565 12 <br /> Subtotal $ 6,856.48 <br />120 hrs <br />Terry Tunnel Hours Factor <br />120 1.07'0.8 hr/hr $ 2.764.26 <br />Subtotal S 2,764.26 <br />