My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-07_PERMIT FILE - M2007044
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2007044
>
2008-02-07_PERMIT FILE - M2007044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:22:24 PM
Creation date
2/13/2008 11:48:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
PERMIT FILE
Doc Date
2/7/2008
Doc Name
Initial reclamation liability estimate
From
DRMS
To
Energy Fuels Resources Corp.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Adjustment from 1996 cost to 2007 costs from Means (2007 <br />Index for 2007= 166.3 <br />Index for 1996= 110.2 <br />166.3/110.2= 1.5 <br /> <br />Task and Cost Item Quant Exten ded Cost <br /> <br />Terry Tunnel 50 hrs. <br /> Terry Tunnel Hours Factor <br />Pack Rat Contingency Bulkhead 50 0.21 hr/hr <br />Pack Rat Contingency Bulkhead <br />1 laborer inside @ $ 26.91 per hr. 10.5 hrs. $ 282.56 <br />1 laborer outside @ $ 26.91 per hr. 10.5 hrs. $ 282.56 <br />1 equip.op. (light) @ $ 37.99 per hr. 10.5 hrs. $ 398.91 <br /> Subtotal S 964.03 <br /> <br />Terry Tunnel 50 hrs. <br /> Terry Tunnel Hours Factor <br />Pack Rat Contingency Bulkhead 50 0.21 hr/hr <br />Pack Rat Contingency Bulkhead <br />1 laborer inside @ $ 26.91 per hr. 10.5 hrs. $ 282.56 <br />1 laborer outside @ $ 26.91 per hr. 10.5 hrs. $ 282.56 <br />1 equip.op. (light) @ $ 37.99 per hr. 10.5 hrs. $ 398.91 <br /> Subtotal S 964.03 <br /> <br />Terry Tunnel 80 hrs. <br /> Teny Tunnel Hours Factor <br />Pack Rat Contingency Bulkhead 80 1.07 hrlhr <br />Note: Due to the less head at Pack Rat Contingency Bulkhead, less thickness, and no Factor <br />valves a reduction factor of 0.6 will be used as well as only 3 laborers inside. 0.6 hr/hr <br />Pack Rat Contingency Bulkhead <br />3 laborer inside @ $ 26.91 per hr. 85.6 hrs. $ 4,146.39 <br />1 laborer outside @ $ 26.91 per hr. 85.6 hrs. $ 1,382.13 <br />1 equip.op. (light) @ $ 37.99 per hr. 85.6 hrs. $ 1,951.24 <br />Pack Rat Contingency Coffer Dam $ 37 99 per hr 40 hrs. $ 1.519.66 <br /> Subtotal 5 8,999.43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.