My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-07_PERMIT FILE - M2007044
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2007044
>
2008-02-07_PERMIT FILE - M2007044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:22:24 PM
Creation date
2/13/2008 11:48:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
PERMIT FILE
Doc Date
2/7/2008
Doc Name
Initial reclamation liability estimate
From
DRMS
To
Energy Fuels Resources Corp.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C) Other Equipment Costs. not including Overhead and Pro fit <br />Task and Cost Item Quantity <br />l Sit <br />Cl <br />ni <br />iti <br />ng <br />1) In <br />a <br />e <br />ea <br />Terry Tunnel <br />' Two yard Load Haul Dump $ 45.00 per hr 10.5 hr; <br />Whirlwind Bulkhead Terry Tunnel Price <br />' 1.25 yard Load Haul Dump $ 35.00 per hr 10.5 hr: <br />Note: 1.25 yard LHD will bee on site for Bulkhead building. <br />21'S~ Rdbar Anchors and Fine Site Cleaning <br />Terry Tunnel <br />' 1.25 yard Load Haul Dump $ 35.00 per hr 10.5 hr< <br />Whirlwind Bulkhead Terry Tunnel Price <br />' 1.25 yard Load Haul Dump $ 35.00 per hr 10.5 hr: <br />3) Build Farms. Set Valves. and Rebar, Divert Water <br />Terry Tunnel <br />' 1.25 yard Load Haul Dump $ 35.00 per hr 85.6 hr< <br />Note: Due to the less head ant Whirlwind Bulkhead, less thi ckness, and no valves a <br />reduction factor of 0.6 will be used as well as only 3 laborer s insi de. <br />Whirlwind Bulkhead Terry Tunnel Price <br />' 1.25 yard Load Haul Dump $ 35.00 per hr 85.6 hr; <br />Terry Tunnel <br />Extended Cost <br />Price Factor Size Factor <br />1.5 $ 551.25 <br />Price Factor Size Factor <br />1.5 $ 551.25 <br />Price Factor Size Factor <br />1.5 0.6 $ 2,696.40 <br />' 1.25 yard Load Haul Dump $ 35.Q0 per hr 21 hrs. <br />' Forklift $ 20.00 per hr 21 hrs. <br />Whirlwind Bulkhead Terry Tunnel Price Price Factor Size Factor <br />' 1.25 yard Load Haul Dump $ 35.00 per hr 21 hrs. 1.5 $ 1,102.50 <br />' Forklift $ 20.00 per hr 21 hrs. 1.5 $ 630.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.