My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-07_PERMIT FILE - M2007044
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2007044
>
2008-02-07_PERMIT FILE - M2007044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:22:24 PM
Creation date
2/13/2008 11:48:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
PERMIT FILE
Doc Date
2/7/2008
Doc Name
Initial reclamation liability estimate
From
DRMS
To
Energy Fuels Resources Corp.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Terry Tunnel <br />' Engineering design $ 4,538.00 each <br />' Engineering Inspections $ 2,077.00 each <br />' Material Testing $ 168.00 each <br />' Miscellaneous small hand tool usage $ 3,000.00 each <br />' Miscellaneous materials (nails, bits, Here, etc.) $ 3.000.00 each <br />' Diesel $ 1,500.00 each <br />' Electricity $ 5.000.00 per month <br />' Safety supplies $ 1,000.00 each <br />' Intake screen, bypass pipe $ 200.00 each <br />Note: Reduction factor of 0.7 will be used for items that apply because of less head, less materials. <br />less complex; a reduction factor of 0.5 will be used for half as long. <br />Whirlwind Bulkhead Terry Tunnel Price Price Facto r Size Factor <br />' Engineering design $ 4,538.00 each 1.5 $ 6,807.00 <br />' Engineering Inspections $ 2,077.00 each 1.5 $ 3,115.50 <br />' Material Testing $ 168.00 each 1.5 $ 252.00 <br />' Miscellaneous small hand tool usage $ 3.000.00 each 1.5 1.07'0.7 $ 3,370.50 <br />'Miscellaneous materials (nails, bits, wire, etc.) $ 3.000.00 each 1 5 1.07'0.7 $ 3,370.50 <br />' Diesel $ 1.500.00 each 3 0.7 $ 3,150.00 <br />' Electricity $ 1,250.00 per week 2 weeks 1.5 $ 3,750.00 <br />' Safety supplies $ 1,000.00 each 1.5 0.5 $ 750,00 <br />' Intake screen, bypass pipe $ 200.00 each 1.5 $ 300.00 <br /> Subtotal S 24,865.50 <br />Terry Tunnel <br />' Generator $ 800.00 each <br />'Fan $ 3,000.00 each <br />' Flatbed truck and loader $ 700.00 each <br />' Contractor install $ 6,400.00 each <br />' Vent bag $ 4,755.00 each <br />Whirlwind Bulkhead Terry Tunnel Price Price Factor Size Factor <br />' Generator $ 800.00 each 1.5 $ 1,200.00 <br />' Fan $ 3.000.00 each 1.5 $ 4,500.00 <br />' Flatbed truck and loader $ 700.00 each 1.5 $ 1.050.00 <br />'Contractor install $ 6,400.00 each 1.5 0.65 $ 6.240.00 <br />' Vent bag $ 4,755.00 each 1.5 0.65 $ 4,636.13 <br /> Subtotal 5 17,626.13 <br />Subtotal Supplies, Equipment, and Engineering, includes overhead and profit 5 "- :.509.21 <br />Add 5% DRMS administration required by statute 5 :.'.775.46 <br />Supplies, Equipment, and Engineering Component of Bulkhead Bond ..~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.