My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-07_PERMIT FILE - M2007044
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2007044
>
2008-02-07_PERMIT FILE - M2007044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:22:24 PM
Creation date
2/13/2008 11:48:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
PERMIT FILE
Doc Date
2/7/2008
Doc Name
Initial reclamation liability estimate
From
DRMS
To
Energy Fuels Resources Corp.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5) 5trio Forms. Move Eauipment, and Grout Bulkhead <br />Terry Tunnel <br />' 1.25 yard Load Haul Dump $ 35.00 per hr <br />Note: Reduction factor for leaving the forms in place 0.8 <br />Whirlwind Bulkhead Terry Tunnel Price <br />' 1.25 yard load Haul Dump $ 35.00 per hr <br />120 hrs. <br />Price Factor Size Factor <br />100 hrs. 1.5 1.07 $ 5,617.50 <br />6) Miscellaneous Costs <br />Terry Tunnel <br />' Compressor usage $ 3.000.00 each <br />' Air Bean 25 pump usage $ 1,200.00 each <br />' Flight 123 HP pump usage $ 1,620.00 each <br />' GD 83 jackleg $ 1.125.00 each <br />' Outside loader $ 6,000.00 each <br />Note: A reduction factor of 0.5 will be used because less material will be moved and less work will tie done and <br />a short rental penod factor of 20°i° will be used <br />Whirlwind Bulkhead Terry Tunnel Price <br />' Compressor usage $ 3.000.00 each <br />'Air Bean 25 pump usage $ 1.200.00 each <br />' Flight 123 HP pump usage Not used at Whirlwind <br />' GD 83 jackleg $ 1.125.00 each <br />' Outside loader $ 6,000.00 each <br />Subtotal Other Equipment, not including overhead and profit <br />Overhead and profit@13.07% <br />Subtotal <br />Add 5°ro DRMS administration required by statute <br />Other Equipment Component of Bulkhead Bond <br />Bond Amount for Whirlwind Bulkhead <br />Supplies, Equipment, and Engineering <br />Other Equipment <br />Total <br />Price Factor Size Factor <br />1.5 0.5'1.2 $ 2,700.00 <br />1.5 0.5'1.2 $ 1,080.00 <br />1.5 0.5'1.2 $ 1,012.50 <br />1.5 0.5'1.2 $ 5,400.00 <br />$ 21,341.40 <br />$ 2.789.32 <br />$ 24,130.72 <br />$ 1,206.54 <br />S 25,337.26 <br />$ 86,113.25 <br />$ 25,337.26 <br />S 111,450.51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.