My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-10_PERMIT FILE - C1980007 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2007-08-10_PERMIT FILE - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:39 PM
Creation date
1/23/2008 11:27:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
8/10/2007
Doc Name
Technical Specifications for Monument Dam Preventive Measures
Section_Exhibit Name
Exhibit 76 Report Spring 2007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02950 <br />SITE RESTORATION <br />PART 1: GENERAL <br />1.01 DESCRIPTION <br />A. All Work included in this Section shall be performed in accordance with the following <br />paragraphs, the provisions of all Contract Documents, and all applicable Laws and <br />Regulations. <br />B. Work covered under this Section includes providing all materials, equipment, and labor <br />to furnish and install materials including, but not limited to: <br />1. Topsoil, seed and mulch along the downstream slope, borrow pit area and any <br />other significantly and substantially disturbed area as a result of <br />CONTRACTOR's activities. <br />2. Disposal of unsuitable material, and stockpile of suitable material from surface <br />preparation. <br />1.02 REFERENCES <br />A. American Society for Testing and Materials, Current Edition, hereafter referred to as <br />ASTM. <br />B. USDA Forest Service -Region 2 Water Conservation Practices Handbook BMP's <br />1.03 SUBMITTALS <br />A. Prior to construction, CONTRACTOR shall submit for information and documentation a <br />plan for site restoration as part of the Contractor Work Plan as set forth in Section 01110 <br />of the Specifications. <br />B. CONTRACTOR shall submit for proof of specification compliance seed mix product <br />information for COMPANY'S approval prior to restoring site and reseeding. Submit for <br />approval all technical data and product information for all slope seeding materials. <br />1.04 SEQUENCING AND SCHEDULING [NOT USED] <br />A. Topsoil for seeding shall be from the stockpile developed during Site Clearing and <br />Grubbing activities as set forth in Section 02300. <br />A. Mulch shall be from the stockpile and Site as developed during Site Clearing and <br />Grubbing activities as set forth in Section 02300. <br />A. Topsoil placement, seeding and mulching shall occur following the disturbance of areas, <br />prior to certification of the construction by Office of the State Engineer. <br />02950-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.