My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-10_PERMIT FILE - C1980007 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2007-08-10_PERMIT FILE - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:39 PM
Creation date
1/23/2008 11:27:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
8/10/2007
Doc Name
Technical Specifications for Monument Dam Preventive Measures
Section_Exhibit Name
Exhibit 76 Report Spring 2007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 3.03 UTILITY STRUCTURE INSTALLATION <br />' A. Utility structures installation shall be conducted in accordance with Section 206, Excavation and <br />Backfill for Structures, and Section 604, Manholes, Inlets and Meter Vaults, of the CDOT <br />Standard Specifications for Road and Bridge Construction. <br />3.04 INTAKE STRUCTURE AND APPURTENANCES <br />A. Field verify location and elevation of existing CIP reservoir outlet and modify intake structure <br />location and elevation to provided the structure, gate and trash rack configuration as shown on the <br />Drawings. Verify modifications with ENGINEER. <br />' B. Coordinate construction of intake structure and trash rack to ensure compatibility: <br />C. Install cast-in wall sleeve with collaz at approximately the center of the wall. Field verify <br />alignment with existing pipe stub. <br />D. Verify angle of side slope prior to fabricating and installing intake pipe with flange for slide gate. <br />' Adjust as required to achieve slope compatible with installation shown on the Drawings. Pipe <br />joints shall be water tight. Coordinate with intake structure and gate stem support block <br />construction with slide gate manufacturer. Gate stem deflection shall not exceed manufacturer's <br />' recommendations. <br />3.05 ABANDONMENT OF EXISTING VALVE <br />' A. Remove pipe with valve as shown on Drawings. <br />B. Install DIP plain end by plain end spool section with couplings. <br />C. Encase invert of manhole with pipe in concrete as shown on the Drawings. <br />1 <br />END OF SECTION 02661 <br /> <br /> <br />~~, <br /> <br />02661-6 <br />II <br />
The URL can be used to link to this page
Your browser does not support the video tag.