My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-10_PERMIT FILE - C1980007 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2007-08-10_PERMIT FILE - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:39 PM
Creation date
1/23/2008 11:27:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
8/10/2007
Doc Name
Technical Specifications for Monument Dam Preventive Measures
Section_Exhibit Name
Exhibit 76 Report Spring 2007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
base bedding layer placed between the geotextile and the riprap on the upstream face shall <br />have the following grain size characteristics. <br />' Typical Stone <br />Dimension (inches) <br />2.5 <br />2.0 <br />1.5 <br />1.0 <br />' 0.5 <br />Typical Stone <br />Dimension (mm) <br />63.0 <br />50.0 <br />37.5 <br />25.0 <br />12.5 <br />Percent Passing (smaller) <br />(dry weight) <br />100 <br />90-100 <br />35-70 <br />0-15 <br />0-5 <br />' 2.04 1tIP1tAP <br />A. ltiprap materials shall be durable stone of a quality suitable to insure permanence in the structure <br />and in the climate in which it is to be used, in accordance with CDOT Standard Specification <br />506.02. The stone shall be well graded within the limits specified herein and shall be free from <br />cracks, seams, and other defects that would unduly increase its deterioration from natural causes. <br />The inclusion of objectionable quantities of dirt, sand, clay, and rock fines will not be permitted. <br />Neither the breadth nor the thickness of any piece of stone shall be less than one third of its <br />length. Occasional pieces of stone slightly lazger than the m~x;mum weight will be permitted <br />provided the gradation and voids are not unduly affected and that surface tolerances aze met. In <br />order to meet the structural design requirements for weight, gradation, and layer thickness, stone <br />for riprap shall have a specific gravity between 2.6 and 2.7. <br />1. Upstream Face: The rock material shall consist of unweathered stone material that has a Dso <br />of at least 6 inches It is expected that riprap, if obtained on site, will require breaking of the <br />existing rock by mechanical means. The material shall be in accordance with CDOT <br />Standard Specification No. 506.02 for the standazd gradation with Dso equal to 6 inches. <br />Typical Stone <br />Dimensions <br />12" <br />9" <br />6" <br />2" <br />Percent Passing <br />(dry weight) <br />70-100 <br />50-70 <br />35-50 <br />2-10 <br />' 2. Outlet Plunge Pool: The rip rap material used for the downstream outlet plunge pool shall <br />consist of unweathered stone material that has a D50 of at least 6 inches It is expected that <br />riprap, if obtained on site, v~nll require breaking of the existing rock by mechanical means. <br />The material shall be in accordance with CDOT Standard Specification No. 506.02 for the <br />' standard gradation with Dso equal to 6 inches. <br />02375-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.