Laserfiche WebLink
1.07 BASIS FOR COMPENSATION <br />A. Compensation for all Work covered under this Section of these Specifications shall be as set forth <br />in Section 01270, Unit Price Measurement and Payment, and the Contract Documents. <br />' PART 2: PRODUCTS <br />2.01 MATERIALS <br />A. Erosion control materials shall be in accordance with the most current Best Management <br /> Practices (BMP's). <br />' PART 3: EXECUTION <br />' 3.01 INTERIM EROSION AND SEDIMENT CONTROL <br />A. Interim erosion and sediment control activities will be required through the duration of the <br />' project. CONTRACTOR shall use BMP's for erosion control. <br />B. Perform temporary erosion control to conform to the requirements of COMPANY, and any <br /> Permits that may apply, including, but not limited to: <br />' 1. Famish, install, and maintain temporary erosion controls necessary to prevent the erosion <br /> and transport of soils, silt, mud, and debris off site or to other areas of the Site where <br />' damage could result. <br /> 2. Temporary erosion controls include, but are not limited to, silt fences, hay bales, and other <br />' means necessary to control erosion. <br /> 3. Construct temporary erosion controls where there is evidence that sediment is being <br /> transported from the Work area, where drainageways flow from the Work area, and <br />' elsewhere as required to control erosion. <br /> 4. Schedule operations to minimize the amount of area disturbed and thus susceptible to <br />' erosion at any given time. <br /> 5. Remove and dispose of all temporary erosion controls when permanent vegetative cover has <br />' been fully established or when earthwork such as diversion dikes have eliminated the <br /> possibility of sediment transport from the Work area. <br />' C. Maintain the appearance and functionality of the temporary erosion control measures throughout <br /> the duration of the Work. <br />1 <br />END OF SECTION 02370 <br /> <br /> <br />02370-3 <br />