Laserfiche WebLink
1.05 REPORT OF ACCIDENT OR INJURY <br />A. CONTRACTOR shall immediately report to COMPANY any accident or injury to <br />personnel or property damage that may occur. Any damage to existing structures by <br />CONTRACTOR shall be repaired promptly by CONTRACTOR at no cost to <br />COMPANY. <br />1.06 BASIS FOR COMPENSATION <br />A: All costs to comply with the requirements of this Section of the Specifications shall be <br />considered to be included in the Contract Price and no additional compensation will be <br />provided. <br />PART 2: PRODUCTS [NOT USED] <br />PART 3: EXECUTION [NOT USED] <br />END OF SECTION 01501 <br />01501-3 <br />