My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-10_PERMIT FILE - C1980007 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2007-08-10_PERMIT FILE - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:39 PM
Creation date
1/23/2008 11:27:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
8/10/2007
Doc Name
Technical Specifications for Monument Dam Preventive Measures
Section_Exhibit Name
Exhibit 76 Report Spring 2007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01505 <br />MOBILIZATION <br />PART 1: GENERAL <br />1.01 DESCRIPTION <br />A. All Work included in this Section shall be performed by CONTRACTOR in accordance with the <br />following paragraphs, the General Requirements set forth in Division 1 of these Specifications and <br />in accordance with all the provisions of the Contract Documents. <br />B. The Work covered by this section of the Specifications consists of, but is not limited to furnishing <br />all supervision, labor, equipment, and materials and performing all operations necessary to: <br />1. Move (mobilize) personnel, equipment, supplies, and incidentals to the project site. <br />2. Perform all preparations necessary to commence performance of the Work, including <br />development of the Work Plan as detailed in Section 01100 of the Specifications. <br />3. Perform all Work that must be performed before beginning Work on the various items <br />described elsewhere in these Specifications. <br />4. Provide temporary utilities. <br />5. Furnish all submittals described in these Specifications. <br />6. Perform project coordination, provide updates, and attend project conferences and meetings. <br />7. Provide on-site health and safety requirements. <br />8. Obtain all approvals, authorizations, letters of acceptance, and/or permits required <br />specifically for this Work as detailed in Section 01100 of the Specifications. <br />9. Maintain a clean and orderly Work site on a daily basis throughout the duration of the project. <br />10. Control of surface water in the Work area, including development and implementation of <br />an interim erosion and sedimentation control plan as detailed in Section 02370. If the <br />permit is required, follow the General Stonn Water Permit for Construction Activity <br />(NPDES/SDS Permit). The intent of the general permit is to prevent erosion from occurring, <br />keep sediment on site, and protect surface water, both during construction and after <br />construction has been completed. <br />11. Dewatering and filling of the depression uphill of the borrow area, as part of the <br />site control of water. <br />01505-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.