My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-10_PERMIT FILE - C1980007 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2007-08-10_PERMIT FILE - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:39 PM
Creation date
1/23/2008 11:27:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
8/10/2007
Doc Name
Technical Specifications for Monument Dam Preventive Measures
Section_Exhibit Name
Exhibit 76 Report Spring 2007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. If CONTRACTOR proposes to use alternate or substitute products, CONTRACTOR shall <br />submit written application. <br />B. Submit three (3) copies of literature, drawings, and any other data necessary to substantiate that <br />proposed substitute is equivalent or equal to the item named. <br />C. Do not proceed with product installation or use until written approval by ENGINEER is <br />received. <br />1.10 RECORD DOCUMENTS <br />A. CONTRACTOR shall submit all record documents (or clearly legible copies) to Engineer upon <br />substantial completion prior to certification by Office of the State Engineer. <br />B. Record documents consist of all Drawings, Specifications, Addenda, Change Orders, Shop <br />Drawings, and other documents requested in Section 017801egibly annotated to reflect all <br />changes made during construction. <br />1.11 WARRANTY OR GUARANTEE CERTIFICATES <br />A. Submit three (3) executed copies to Engineer upon substantial completion prior to certification <br />by Office of the State Engineer. <br />B. All warranty or guarantee certificates shall be signed by CONTRACTOR and all other parties as <br />requested in specific sections. <br />1.12 BASIS FOR COMPENSATION <br />A. All costs to comply with the requirements of this Section of the Specifications shall be <br />considered to be included in the Contract Price and no additional compensation will be <br />provided. <br />PART 2: PRODUCTS [NOT USED] <br />PART 3: EXECUTION [NOT USED] <br />END OF SECTION 01330 <br />01330-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.