My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-10_PERMIT FILE - C1980007 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2007-08-10_PERMIT FILE - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:39 PM
Creation date
1/23/2008 11:27:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
8/10/2007
Doc Name
Technical Specifications for Monument Dam Preventive Measures
Section_Exhibit Name
Exhibit 76 Report Spring 2007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.06 REVIEW OF SUBMITTALS <br />A. ENGINEER's review of engineering data will cover only general conformity of the data to the <br /> Specifications and Contract Documents, external connections, and interfaces with equipment <br /> and materials famished under separate specifications. ENGINEER'S review does not indicate a <br /> thorough review of all dimensions, quantities, and details of the equipment, material, device, or <br /> item indicated or the accuracy of the information or documentation submitted; nor shall review <br /> or approval by ENGIlVEER be construed as relieving CONTRACTOR from any and all <br /> responsibility for errors or deviations from the requirements of the Contract Documents. <br />B. All engineering data submitted, after final processing by ENGINEER shall become a part of the <br />' Contract Documents and the Work indicated or described thereby shall be performed in <br /> conformity therewith unless otherwise required by COMPANY. <br />' 1.07 SUBMITTAL FOR INFORMATION OR DOCUMENTATION <br />A. Submit three copies: one copy for ENGINEER, one copy for COMPANY, and one copy for <br />' DAM FACILITY OWNER. <br />B. Submittal shall be made at least 5 days before the subject of the submittal is to be incorporated <br /> into the Work. <br />C. Submittal is for the purpose of formal verification that the subject of the submittal conforms to <br /> the requirements of the Specifications, for formal documentation of the Work, or both. <br />D. No action is required by COMPANY or ENGINEER. ENGINEER will generally notify <br />CONTRACTOR if deficiencies are identified, however CONTRACTOR is solely responsible <br />for ensuring that the subject of the submittal conforms to the requirements of the Specifications. <br />1.08 SUBMITTAL FOR PROOF OF SPECIFICATION COMPLIANCE <br />A. Submit two copies: one copy for ENGINEER, one copy for COMPANY. COMPANY copy <br />maybe submitted to ENGINEER if authorized by COMPANY. <br />B. Submittal shall be made at least 5 days before the subject of the submittal is to be incorporated <br />into the Work. <br />C. Submittal is for the purpose of formal verification that the subject of the submittal conforms to <br />the requirements of the Specifications, for formal documentation of the Work, or both. <br />D. No action is required by COMPANY or ENGINEER. ENGINEER will generally notify <br />CONTRACTOR if deficiencies are identified, however CONTRACTOR is solely responsible <br />for ensuring that the subject of the submittal conforms to the requirements of the Specifications. <br />Any testing and/or resubmittal due to failure of CONTRACTOR's initial submittal to meet the <br />requirements of the Specifications shall be at the sole expense of the CONTRACTOR. <br />Resubmittal (if necessary) is required until the testing and/or resubmittal is in accordance with <br />the Specifications. <br />1.09 ALTERNATE PRODUCT SUPPORTING DATA <br />01330-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.