My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-10_PERMIT FILE - C1980007 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2007-08-10_PERMIT FILE - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:39 PM
Creation date
1/23/2008 11:27:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
8/10/2007
Doc Name
Technical Specifications for Monument Dam Preventive Measures
Section_Exhibit Name
Exhibit 76 Report Spring 2007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Applications for Payment shall be consistent with the actual Work completed as of the <br />date of application. Applications should be consistent with the current Schedule of Values <br />and progress schedule, and if not, those schedules should be modified as set forth <br />elsewhere in this section. <br />Incomplete or deficient Applications for Payment will be returned to CONTRACTOR by <br />ENGINEER. CONTRACTOR shall correct such deficiencies and resubmit the Application <br />for Payment. <br />B <br />C. <br />Payment for Mobilization Expenses <br />CONTRACTOR may include items in the Schedule of Values for mobilization. Mobilization <br />may include, but is not limited to, operations necessary to move personnel, equipment, supplies <br />and incidentals to the site and removing them from the site following completion of the Work; <br />furnishing bonds and insurance required specifically for this Project; furnishing submittals as <br />specified; obtaining all permits required specifically for the Work; and performing all Work to <br />restore the Project site to a condition equal to or better than its original condition that is not <br />specifically provided for elsewhere in these Specifications. <br />Progress payments for any mobilization expense, or any other line item in the Schedule of <br />Values which does not relate to a physical component of the Work at the site, will be made only <br />in the amount of actual expenses incurred as evidenced by receipts or other evidence of incurred <br />cost satisfactory to ENGINEER and COMPANY. Payment for such expenses for which <br />supporting documentation is not provided will be made at the completion of the Work. <br />Initial Application for Payment <br />CONTRACTOR shall not make its initial application for payment until the required <br />administrative procedures have been complied with in Accordance with the Contract <br />Documents. These procedures include, but may not be limited to, submittal of acceptable: <br />1. progress schedule, <br />2. Schedule of Values, <br />3. schedule of submittals. <br />D. <br />Supporting Data <br />Each Application for Payment shall be accompanied by such supporting data as may be required <br />by COMPANY or ENGINEER to substantiate CONTRACTOR'S application. All Applications <br />for Payment which include payment for shop fabricated equipment shall be accompanied by <br />invoices and records from the fabricator substantiating the progress of the Work on each of the <br />individual pieces of equipment. Receipts for materials shall indicate the specific piece of <br />equipment for which the materials will be used. Time reports and other records shall be <br />furnished to verify the fabricator's costs. Reports shall contain only information pertinent to this <br />Project and shall contain summaries of all detailed information. If requested, CONTRACTOR <br />shall provide photographs showing the status of construction of the shop fabricated components. <br />Photographs shall have the date of the photograph displayed on the photo. <br />01330-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.