My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-10_PERMIT FILE - C1980007 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2007-08-10_PERMIT FILE - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:39 PM
Creation date
1/23/2008 11:27:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
8/10/2007
Doc Name
Technical Specifications for Monument Dam Preventive Measures
Section_Exhibit Name
Exhibit 76 Report Spring 2007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Basis of Payment: CONTRACTOR will be paid for furnishing all labor, equipment, and <br />materials, and performing all operations necessary to furnish, load, haul, place and <br />compact the Granular Base on the basis of a unit price per cubic yard, all in accordance <br />with the Drawings and Specifications. <br /> <br />Upstream Riprap <br />1. Method of Measurement: Riprap provided will be measured by the in-place volume in <br />cubic yards (CY) as determined by the average end area method using surveys performed <br />by COMPANY or COMPANY'S Representative. <br />2. Basis of Payment: CONTRACTOR will be paid for furnishing all labor, equipment, and <br />' materials, and performing all operations necessary to load materials from the material <br />source stockpile and to haul and place on the basis of a unit price per cubic yard. <br />' J. Downstream Trench Drains <br />1. Method of Measurement: Trench Drains will be measured by plan quantity in place <br />' volume in cubic yards (CY) as determined by the dimensions shown on the construction <br />drawings. <br />2. Basis of Payment: CONTRACTOR will be paid for fuunishing all labor, equipment, and <br />t materials and performing all operations necessary to furnish, load, haul, place and compact <br />the Downstream Trench Drains on the basis of a unit price per plan cubic yard, all in <br />accordance with the Drawings and Specifications. <br />K. Interceptor Drain <br />1. Method of Measurement: Trench Drains will be measured by plan quantity in place <br />volume in cubic yards (CY) as determined by the dimensions shown on the constnzction <br />drawings. <br />' 2. Basis of Payment: CONTRACTOR will be paid for furnishing all labor, equipment, and <br />materials and performing all operations necessary to furnish, load, haul, place and compact <br />the Downstream Trench Drains on the basis of a unit price per plan cubic yard, all in <br />' accordance with the Drawings and Specifications. <br />L. Clay Cap <br />Method of Measurement: Clay Cap over Trench Drains will be measured by plan quantity <br />in place volume in cubic yards (CY) as determined by the dimensions shown on the <br />construction drawings. <br />2. Basis of Payment: CONTRACTOR will be paid for furnishing all labor, equipment, and <br />materials and performing all operations necessary to furnish, load, haul, place, moisten (if <br />necessary) and compact the Clay Cap on the basis of a unit price per plan cubic yard, all in <br />accordance with the Drawings and Specifications. <br />M. Downstream Drainage Blanket <br />01270-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.