My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-10_PERMIT FILE - C1980007 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2007-08-10_PERMIT FILE - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:39 PM
Creation date
1/23/2008 11:27:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
8/10/2007
Doc Name
Technical Specifications for Monument Dam Preventive Measures
Section_Exhibit Name
Exhibit 76 Report Spring 2007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 1. Method of Measurement: Downstream Drainage Blanket will be measured by plan <br />quantity in place volume in cubic yards (CY) as determined by the dimensions shown on <br />' the construction drawings. <br />2. Basis of Payment: CONTRACTOR will be paid for furnishing all labor, equipment, and <br />' materials and performing all operations necessary to furnish, load, haul, place and compact <br />the Downstream Drainage Blanket Filter Aggregate on the basis of a unit price per plan <br />cubic yard, all in accordance with the Drawings and Specifications. <br />' N. Downstream Earth Buttress <br />1. Method of Measurement: General Fill will be measured by in place volume in cubic yards <br />(CY) as determined by the average end area method using the survey performed by <br />COMPANY or COMPANY'S Representative. <br />2. Basis of Payment: CONTRACTOR will be paid for furnishing all labor, equipment, and <br />materials and performing all operations necessary to excavate, and load from the material <br />source, haul, place, moisten (if necessary) and compact the Downstream Earth Buttress on <br />the basis of a unit price per cubic yard, all in accordance with the Drawings and <br />Specifications. <br />O. Reservoir Discharge Facilities <br />Method of Measurement: Reservoir Dischazge Facilities will be furnished and installed as <br />a lump sum (LS) upon completion, all in accordance with the Drawings and Specifications. <br />2. Basis of Payment: CONTRACTOR will be paid in full for famishing all labor, equipment, <br />and materials, and performing all operations as are necessary to furnish and install the <br />structural concrete intake structure, trash rack, gate, gate control and required structural <br />elements and granular base, furnish and install the structural concrete operator platform, <br />abandon the existing valve and vault, furnish and install the drop structure, furnish and <br />install the RCP outlet and bedding aggregate, and furnish and install outlet energy <br />dissipater, including riprap, granular base, and geotextile fabric. <br />P. Site Restoration <br />Method of Measurement: Site Restoration will be measured by the area in acres (Acres) to <br />the nearest tenth of an acre. The area will be determined based on COMPANY'S survey of <br />the actual horizontal surface area of the area requiring restoration within the construction <br />limits. Areas disturbed outside the construction limits shall be fully restored by <br />CONTRACTOR without cost to COMPANY. <br />2. Basis of Payment: CONTRACTOR will be paid in full for famishing all labor, equipment, <br />and materials, and performing all operations as aze necessary to salvage topsoil, furnish <br />and install the topsoil, furnish and install seed and mulch, all in accordance with the <br />Drawings and Specifications. <br />01270-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.