My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-10_PERMIT FILE - C1980007 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2007-08-10_PERMIT FILE - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:39 PM
Creation date
1/23/2008 11:27:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
8/10/2007
Doc Name
Technical Specifications for Monument Dam Preventive Measures
Section_Exhibit Name
Exhibit 76 Report Spring 2007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. Survey Markers: CONTRACTOR shall conduct operations so as to preserve benchmarks, survey <br />reference points, and stakes, existing or established by COMPANY for the construction. <br />CONTRACTOR will be charged the expense of repairing or replacing survey markers and shall <br />be responsible for mistakes or lost time that results due to damage or destruction of survey <br />markers due to CONTRACTOR's operations. <br />1.09 CONTRACTOR WORK PLAN <br />' A. Prior to construction, CONTRACTOR shall submit for information and documentation to <br />COMPANY a detailed Work Plan outlining the proposed methods and sequences that shall <br />include, but is not limited to, erosion control measures, clearing, excavating, control of <br />' water, material source development and stockpiling, traffic safety precautions, earthwork, <br />protection of existing instrumentation, facility constructions, and all other Work. All <br />proposed elements, methods, materials, and sequences shall be in accordance with Laws <br />and Regulations. Review of the Work Plan by COMPANY does not relieve <br />' CONTRACTOR from responsibility for the Work and construction sequences and <br />methods. All proposed elements, methods, materials, and sequences shall be in accordance <br />with Laws and Regulations. Any proposed significant or substantial changes to the Work <br />' shall be authorized by the Colorado Division of Water Resources -Office of State <br />Engineer. The plan shall be in accordance with the scheduling requirements set forth in <br />Section 01311. <br />1.10 CONTRACTOR INTERIM EROSION AND SEDIlVIENTATION CONTROL PLAN <br />A. Prior to construction, CONTRACTOR shall submit for information and documentation an <br />interim erosion and sedimentation control plan for the Work. The plan shall be submitted <br />in conjunction with the Contractor Work Plan. Review of the interim erosion and <br />sedimentation control plan by COMPANY does not relieve CONTRACTOR from <br />responsibility for the Work and construction sequences and methods. All proposed <br />elements, methods, materials, and sequences shall be in accordance with Laws and <br />Regulations. Any proposed significant or substantial changes to the Work shall be <br />authorized by the Colorado Division of Water Resources -Office of State Engineer. The <br />plan shall be in accordance with the scheduling requirements set forth in Section 01311. <br />1.11 SEQUENCE OF WORK <br />A. Work shall commence as detailed in the Agreement and shall be completed on or before the date <br />indicated in the Agreement. <br />B. CONTRACTOR shall determine the sequence of Work required to efficiently carry out the <br />Work. The sequence of the Work shall be clearly evident from CONTRACTOR'S Work Plan and <br />construction schedule. <br />1.12 WORK BY OTHERS <br />A. CONTRACTOR is responsible for all coordination with other Work, if applicable. <br />01110-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.