Laserfiche WebLink
52.05 APPLICATION FOR PERMIT FOR SURFACE OR UNDERGROUND MINING ACTIVITIES -- <br />MINIMUM REQUIRElfENTS FOR OPERATION AND RECLAMATION PLANS. <br />2.05.4 Reclamation Plan. <br />C2) ~d) 1COnC'd.) <br />the year for construction of the soil berms around the <br />waste disposal pile. Subsoil which was excavated <br />during construction of [he waste disposal pi[ was also <br />stored nearby and utilized for construction of berms. <br />Soils were resampled prior to the expansion of the Wes[ <br />Ridge Waste Disposal Area and a sieve analysis <br />performed. Based on the results of [his analysis, 8" <br />[0 9" of topsoil were stripped and will be replaced on <br />the remainder of the i.'est Ridge i,'aste Disposal Area, <br />Future enlargement of the waste disposal area mill <br />follow procedures outlined in the Topsoil Handling <br />Plan. See [he Soils-Tests Appendix in Volume 9 for <br />more information. <br />fie) Revegetation Plan <br />Revegetation at the Orchard Valley Mine will be accom- <br />plished according [o a strict timetable involving soil <br />preparation, seeding with adapted species mix, planting <br />of containerized stock, fertilization, mulching and <br />monitoring of results to achieve a native plan[ cover <br />• consistent with the desired land use goals. <br />. Added 07/13/87 <br />Revised 07/13/67 <br />Revised 10/O1/b7 <br />67 <br />