Laserfiche WebLink
<br />BOND ESTIMATE <br />TEMPORARY R-O-M COAL STOCKPILE <br />C~ <br />MR # 6{t <br />REQUIREMENTS: <br />A) Redistribute Plant Growth Media. <br />B) Seed Area. <br />REDISTRIBUTE PLANT GROWTH MEDIA: <br />4/27/90 <br />A) 5200 CY To Redistribute. <br />B) Average Push - 300', 0$ Grade. <br />C) Use a D-8, Universal Blade. <br />D) Hourly Cost $112.43 (from prior bond). <br />HOURLY PRODUCTION - 475 LCY. <br />ADJUSTED HOURLY PRODUCTION FACTOR: <br /> <br />A) Operator - 1 <br />B) Material - 1.2 <br />C) Slot Dozing - 1.2 <br />D) Job Efficiency - .84 <br />PRODUCTION = 475 LCY/HR X 1.2 X 1.2 X .84 <br />= 575 LCY/HR <br />5200 CY <br />575 LCY/HR = 9.04 HRS <br />SAY $1,000 <br />SEED AREA <br />Seeding & Site Prep. - $538.67/ac (from prior bond) <br />6.4 Acres to Seed. <br /> <br />6.4 acres x $538.67 = $3,447 <br />SAY $3,400 <br />BOND SUMMARY <br />• <br />Plant Growth Media Replacement $1,000 <br />Revegetation 3.400 <br />Subtotal $4,400 <br />10$ Adm 400 <br />Total $4,840 say $4,800' <br />