Laserfiche WebLink
acres. The Mayflower Facility (34) , Construction Settling Ponds <br /> (37) , Cyclone Facility (20) , Pond Shop Facility (21) , and the <br /> Mayflower Topsoil Stockpile No. 1 (35) affect an additional 45 <br /> acres associated with tailing deposition and site preparation. <br /> The Buffehr' s Quonset Facility (9) , Observatory Ware- <br /> house (42) and Summit County Warehouse (43) are used for equip- <br /> ment and materials storage and contractors use. <br /> The Oxide Tailing Pond (40) is presently not an active <br /> tailing deposition site, but may be used as a backup system. <br /> Oxide tailing was disposed of on the site during the mid-1960 ' s <br /> and currently affects 43 acres. <br /> Since 1969 , Climax has actively mined the Arkansas <br /> Aggregate area (4) which essentially covers 85 acres. Mining <br /> will be temporarily. discontinued in 1977 in this area and be <br /> resumed again around 1985. Portions of the pit have already been <br /> depleted of aggregate and are currently under reclamation (approxi- <br /> mately 10 acres) . Additional disturbance will occur this fall_ <br /> when the Arkansas River is relocated to provide access to , aggre- <br /> gate reserves when mining resumes. Additional acreage will not <br /> be affected by the construction which has been authorized with a <br /> U.S. Army Corps of Engineers 404 Permit. <br /> The Kokomo Facility and Aggregate area (27) is currently <br /> under preparation and mining will commence when the Arkansas <br /> Aggregate area is discontinued. Total acreage of the site is 302 <br /> acres, part of which will be mined until approximately 1985, when <br /> it is anticipated to be covered by the advancing Mayflower Tailing <br /> 6-5 <br />