Laserfiche WebLink
~. <br />~atttbert anb ~~~otiate~ <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />,' 1 <br />DAILY FIELD REPORT <br />PROJECT NUMBER: M97181M'r DATE: Wednesday, a-06-97 <br />PROJECT NAME: Bowie Resources Gob Pile TECHNICIAN: Conner <br />PROJECT LOCATION: Paonia, Colorado WEATHER CONDITIONS: Overcast <br />CLIENT: Farnsworth Construction WORK REQUESTED; Density tests <br />CONTRACTOR: Farnsworth Construction FOREMAN: Mrs. Pat Farnsworth <br />WORK PERFORMED BY LAMBERT AND ASSOCEATES REPRESENTATIVE AND REMARKS <br />I arrived at the project site at 5:30 P.M. as requested by Mrs. Pat Farnsworth. <br />I performed soil density tests as requested by Mrs. Farnsworth of material being <br />placed on the gob pile, using nuclear soil density test methods. Please refer to <br />the test results sheets for approximate test locations and test results. The test <br />results indicate only the relative compaction and soil moisture mntent of the <br />material tested at the elevation and location tested at the time of our site visit. <br />1" <br />a. o. sox 2W~ o. o. aox awa :+~ looo OR. <br />GRAND JUNCTgN, CO {1002 MOHTRO!!, CO 01 X02 pURAN00.00 {1201 <br />(070) 2r1A600 (070) 2/F270{ (01012010000 <br />