Laserfiche WebLink
~tttbert arib ~gotiate~ <br />~1 <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT <br />PROJECT NUMBER: <br />PROJECT NAME: <br />PROJECT LOCATION <br />CLIENT: <br />CONTRAC70R: <br />M97181MT <br />Bowie Resources Gob Pile <br />Paonia, Colorado <br />Farnsworth Construction <br />Farnsworth Construction <br />DATE: Thursday, 8-07-97 <br />TECHNICIAN: Conner <br />WEATHER CONDITIONS: partly <br />cloudy <br />WORK REQUESTED: Density tests <br />FOREMAN: Mrs. Pat Farnsworth <br />WORK PERFORMED BY LAMBERT AND ASSOCIATES REPRESENTATIVE AND REMARKS <br />I arrived at the project site at 6:00 P.M. as requested by Mrs. Pat Farhsworth. <br />I performed soil density tests as requested by Mrs. Farnsworth of material being <br />placed on the gob pile, using nuclear soil density test methods. Please refer to <br />the test results sheets for approximate test locations and test results. The test <br />results indicate only the relative compaction and soil moisture content of the <br />material tested at the elevation and location tested at the time of our site visit. <br />'.. <br />a. o. eox xsn o. o. eox oas au eooo Da <br />ORAND,IUNCTION, CO X1907 YONTROet, CD t1 b9 DU11AN00, CO etwt <br />ls~ol7~F960e p~ol7ums+ lnolxs-9ose <br />