Laserfiche WebLink
~` <br />~atrtbert attb ~ggotiateg }=~~~~~~~~ <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING D~C .~ .~ ~39~ <br />DAILY FIELD REPORT <br />PROJECT NUMBER: <br />PROJECT NAME: <br />PROJECT LOCATION: <br />CLIENT: <br />CONTRACTOR: <br />M97181MT <br />Bowie Resources Gob Pile <br />Pao nia, Colorado <br />Farnsworth Construction <br />Farnsworth Construction <br />hivici4n a1 Min ora lc k ~~aa;Flp',' <br />DATE: Monday, 8-04-97 <br />TECHNICIAN: Conner <br />WEATHER CONDITIONS: Overcast <br />with rain <br />WORK REQUESTED: Density tests <br />FOREMAN: Mrs. Pat Farnsworth <br />WORK PERFORMED BY LAMBERT AND ASSOCIATES REPRESENTATIVE AND REMARKS <br />i arrived at the project site at 5:30 P.M. as requested by Mrs. Pat Farnsworth. <br />i performed soil density tests as requested by Mrs. Farnsworth of material being <br />placed on the gob pile, using nuclear soil density test methods. Please refer to <br />the test results sheets for approximate test locations and test results. The test <br />results indicate only the relative compaction and soil moisture content of the <br />material tested at the elevation and location tested at the time of our site visit. <br />1 ) <br />~. <br />a. o. sox sfa v. o. aox oas xu sooo oR. <br />ORAND,IUNCTION,COf1sm YONTROel.CO ft~ DURANOO.oo nx+ <br />(f70) tIf-f60f ~ (f70) ~~f•ttf~ (f70) tff-60M <br />