My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP52470
DRMS
>
Back File Migration
>
Report
>
REP52470
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:57:01 AM
Creation date
11/27/2007 1:21:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
2/11/1997
Doc Name
PN C-81-038 1997 3RD QTR GOB AND POND INPECTION REPORTS
From
BOWIE RESOURCES LTD
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Bowie Resources Ltd. <br />Bowie #1 Mine <br />Quarterly Waste Disposal Area Inspection Report <br />3rd Quarter of 1997 <br /> <br />Item Yes/No Comments <br />1 Quantity of waste material added to waste disposal Yes Approximately 1,540 culyrd. of gob was added to tfie <br /> area during reporting period. waste disposal pile during this reporting period. <br />2 Waste material deposited and compacted in Yes Waste material was compacted during this <br /> 24 inch lifts? reporting period. <br />3 Drainage alterations constructed? No No drainage alterations were constructed during this <br /> reporting period. The existing drainage pattern was <br /> maintained around the perimeter of the pile to protect <br /> outslopes and direct drainage at the toe of the pile. <br />4 Present height of waste material? Highest height approximately 99 feet. <br />5 New bench constructed? No <br />6 Refuse material outslopes placed at 1 V:2V outslopes? Yes Slopes were checked for proper placement during <br /> previous inspections. <br />7 Adequate drainage on top of completed fll? Yes Grading was maintained on top of fully completed fill <br /> lift areas to ensure proper drainage from top of pile. <br />8 Bench drainage adequate? Yes Bench drainage was maintained thoughout the quarter. <br />9 Outslopes covered with 4 foot non-toxic, Yes Yes, outslopes were covered during this reporting period. <br /> non-combustible material? <br />10 Berms constructed on outslopes? Yes <br />11 Evidence of shuctural defects? No <br />12 Topsoil adequately salvaged and stored? NA No additional topsoil was salvaged during this reporting <br /> period. <br />13 Trash removed? Yes Trash was removed upon delivery of gob to refuse pile <br /> during this reporting period. <br />14 Additional comments? No Drainage control was monitored and maintained <br /> throughout the 3rd quarter of 1997. (This include <br /> drain from Outfall 001) <br />I certify the above report as being accurate to the best of my knowledge. <br />ii-~a -97 <br />ORTG09.%LS 11/9/97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.