Laserfiche WebLink
quarry site as needed to prevent erosion of any soils which may be exposed during stripping <br />operations. <br />Mining and Rock Crushing <br />The mining phase includes the following activities; rock mining, rock crushing, and product <br />stockpiling. The mining will utilize heavy equipment such as bull dozers to extract material from <br />the quarry. Loaders will feed the material into the rock crusher, which will convey the material <br />to stockpiles. Loaders will fill trucks for transport to construction sites in the area. <br />Abandonment and Final Reclamation <br />When the mining operation is completed, the site will be abandoned. The quarry area will be <br />reclaimed by replacing the stockpiled top soil, and seeding of disturbed soil areas in order to <br />reestablish cover vegetation, and by maintenance of erosion and sediment control structures as <br />needed. <br />E07147 PAGE 6 OF 16 CORDILLERAN COMPLIANCE SERVICES, INC <br />CIRCLE DOT QUARRY GRAND JUNCTION, COLORADO