My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP50584
DRMS
>
Back File Migration
>
Report
>
REP50584
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:55:32 AM
Creation date
11/27/2007 12:53:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
2/1/1992
Doc Name
INSTRUMENT LOG-JANUARY 1992
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
all the wires. ~t the Chromalox temperatt~ controller <br />ready for shipm <br />3) Ordered several items and resolved a minor ordering <br />problem with Allen-Bradley. <br />- ordered a ball valve for valve 208. <br />- ordered new Allen - Bradley control panel power supply. <br />*as soon as it is in I'll return the Allen-Bradley control <br />panel kit. <br />4) Joel asked me to make out a work order for water <br />protection on the tails HCN detector. <br />1/13/92 <br />1) Worked on 413 inter-tank screen, the breaker tripped for <br />no apparent reason. The screen was not able to work off the <br />hand station in manual (may have something wrongg with the <br />Allen-Bradley switch or some relay used for lockin), however <br />I was able to get it to run off of the PLC. <br />2) organized and cleaned my desk and shelves in office. <br />3) Worked on organizing the Mill warehouse. Finished a <br />four foot shelve and placed all the westing house parts on <br />it. Started separating the parts associated with specific <br />items. <br />4) Helped Larry and Ed blast feeder 3. <br />5) Helped Larry clean up the Shop. <br />1/15/92 <br />1) Helped Paul with the air gas mixture for the Boiler. <br />2) sweeper out the ware house and in my office. <br />3) Called people at Chromalox check on the Chromalox I had <br />just sent in. Found out that they want to charge me for a <br />new unit. <br />4) Worked and getting the specifications for the broken <br />security camera cable. Got the specifications for ordering a <br />new cable and filled out a requisition. <br />1/15/92 <br />1) Talked with the Omega Technician on ordering new temp. <br />controllers for the Sag and.Ball mill gear boxes. He <br />suggested I get an inexpensive relayed controller/indicator. <br />I read through the specs on it and decided on ordering it. <br />-NEMA 4 front panel <br />-front panel programmable. <br />2) Worked on etting the wiring diagrams for the Nalco pump <br />so as to send i~ a 4-20 MA consoling signal. <br />3) Helped Operations with a plugged Sag chute. <br />
The URL can be used to link to this page
Your browser does not support the video tag.