<br />list and the spare parts list. <br />4) Found that the Ball Mill Chromalox heater was damaged by <br />a bunch of slurry leaked on it by the ruptured cyclone feed <br />line. Took out the card and tried to clean the out the mud <br />and slurry. <br />1/~/9z <br />1) Calibrated Ph probes. <br />warehouset quite a bit of time assembling shelves for the <br />3) Wired level indicator on the floc mix pump. <br />1/8/92 <br />1) Cleaned cyclone overflow Ph meter. <br />2) Installed a new solenoid on the new Clarkson valve on <br />the tails discharge. The installation included rewiring the <br />and installin new poly flow from the solenoid to the valve <br />and mounding ~he solenoid to the valve. <br />3) Installed new power source for the strip control panel. <br />I had received the entire control panel even though I had <br />just ordered the power source from Allen Bradley. Had to <br />call Allen Bradley up to get a reimbursement. <br />1/9/9z <br />1) Started to reorganized the warehouse. Sorted through <br />and stocked the Allen Bradley arts onto there own separate <br />shelves. Went through The instrumentation shelves are <br />reorganized them. <br />2) Rich Nie and I calibrated the density meter for the <br />cyclone feed line. <br />3) Operations need power to some outlets so I ave them <br />power on the timer for twelve hours. I turned off the power <br />when they were done. <br />4 Was Called out at seven in the afternoon to repair the <br />strip processor. R'he Power to the processor was cut off and <br />needed to be turned on at the breaker. <br />1/10/92 <br />1) Cleaned cyclone Ph probe,and checked calibration on all <br />probes, calibrated the titration room Ph probe. <br />2) I removed the Ball mill gear box chromalox and taped up <br />