My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP50288
DRMS
>
Back File Migration
>
Report
>
REP50288
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:55:20 AM
Creation date
11/27/2007 12:48:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Report
Doc Date
5/29/2002
Doc Name
Request for Support on Excess Spoill Fill Reports Memo
From
KAG
To
BGW
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lorencito Fill Report Review <br />May 29, 2002 <br />Page 12 of 14 Pages <br />delete this sentence. Recommend the addition to your draft comments (Disposal of Excess Spill <br />Fill Area #8 First Quarter 2002 Certification March 30, 2002) the following: <br />Please add to the certification (page 2) that Ronald G. Thompson, a qualified professional <br />specialist experienced in construction of earth and rockfill embankments, accomplished the <br />inspection under the direction of Charles W. McGlothlin. <br />Please note that inspection reports are due within two weeks of the inspection [Rule <br />4.09.1(11)(b)]. <br />Please add to the report that there was no appearance of instability, structural weakness, <br />or other hazardous conditions during the inspection. <br />Disposal of Excess Spill Fill Area #7 Construction April 12, 2002 <br />Rule or Permit Re uirement Com liance <br /> <br />Rule 4.09.1(11 a The fill shall be ins ected for stabilit <br /> by a registered engineer or other qualified professional Perhaps <br /> specialist experienced in construction of earth and rockfill <br /> embankments under the direction of a qualified <br /> rofessional en ineer <br /> At least uarterl throu hour the construction Yes <br /> And durin the followin critical construction eriods: <br />4.09.1(4) (1)removal of all organic material and topsoil [see also Completed <br /> Rule 4.09.1 4 earlier. <br /> (2)placement of underdrainage systems, Completed <br /> earlier. <br /> (3) installation of surface drainage systems, Yes. <br /> Construction <br /> underwa . <br /> (4) placement and compaction of fill materials, [see also Yes <br /> Rule 4.09.1(7), PAP Exhibit 13 page 17, and PAP Exhibit <br /> 13 page 3}.The excess spoil shall be placed in horizontal <br /> lifts.. Lifts are to be 6 to 8 feet thick, level, and compacted <br /> by dozer or trucks, within 50 feet of the slope Face. There <br /> are no compaction specifications. Beyond, up to 50 to 100 <br /> Feet layer thickness by end dumping can be used. Slope <br /> layers are to be avoided. Face slopes are to be 2.5: ] with <br /> 20-foot benches at 40-foot vertical intervals. Benches are <br /> back-slo ed at 5% and side slo ed at 2% to relief drains. <br /> And (5) revegetation. Not yet <br /> a licable <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.